12.07.2015 Views

Request for Proposal (RFP) for appointment of Valuer for ... - Tender

Request for Proposal (RFP) for appointment of Valuer for ... - Tender

Request for Proposal (RFP) for appointment of Valuer for ... - Tender

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

42COLONY : Colony is spread over an area <strong>of</strong> 184 acreswhich is a mini town by itself. It has 932 nos.Quarters, Administration Building, Co-operativestore, two Transit Houses, Hospital, School,Club, Market Center, Auditorium, Creche andrest shed.TECHNOLOGY : The original Plant was set up with the technicalcollaboration with M/s. Fried Krupp <strong>of</strong> WestGermany. M/s. A.G. Wesser <strong>of</strong> West Germanywas technical collaborator <strong>for</strong> its Power Plants.The manufacturing process involves carbothermic reduction <strong>of</strong> iron ore by burning <strong>of</strong>metallurgical coke with pre-heated air in thetemperature range <strong>of</strong> 800 o C to 900 o C blownthrough tuyers located at certain level abovethe tap-hole. The impurities reacting withlimestone and dolomite <strong>for</strong>m a fusible slagwhich floats on the surface <strong>of</strong> molten metal.Hot metal is tapped at fixed intervals <strong>of</strong> fourhours through the tap hole. The slag is tappedtwo hours after each metal tapping throughCinder notch. The metal after being tapped inthe laddle, the ladle is sent to Pig CastingMachine <strong>for</strong> casting into Pig slabs.A part <strong>of</strong> the hot metal is transferred to SpunPipe Division <strong>for</strong> manufacture <strong>of</strong> Cast Iron SpunPipes.ISO: 9001:2008 : The company has been accredited with ISO:9001:2008 Certificate since November 1996.ISO:14001:2004 : The company has also obtainedEnvironmental Management System StandardCertificate.POLLUTIONCONTROL: An ESP has been installed to clean theFurnace Gas which is being used in theCaptive Power Plant <strong>for</strong> generation <strong>of</strong> power.The Unit has necessary clearance from theState Pollution Control Board.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!