12.07.2015 Views

ICE MACHINES Q-Model Service Manual

ICE MACHINES Q-Model Service Manual

ICE MACHINES Q-Model Service Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 6Electrical SystemDIAGNOSING FREEZE CYCLE POTABLE WATERLEVEL CONTROL CIRCUITRYProblem: Water Trough Overfilling During TheFreeze CycleStep 1 Start a new freeze sequence by moving the <strong>ICE</strong>/OFF/CLEAN toggle switch to OFF, then back to <strong>ICE</strong>.ImportantThis restart must be done prior to performingdiagnostic procedures. This assures the icemachine is not in a freeze cycle water inlet valvesafety shut-off mode. You must complete the entirediagnostic procedure within 6 minutes of starting.Step 2 Wait until the freeze cycle starts(approximately 45 seconds, the freeze cycle starts whenthe compressor energizes) then connect a jumper fromthe water level probe to any cabinet ground.ImportantFor the test to work properly you must wait until thefreeze cycle starts, prior to connecting the jumperwire. If you restart the test you must disconnect thejumper wire, restart the ice machine, (step 1) andthen reinstall the jumper wire after the compressorstarts.YELLOWCLEAN LIGHTGR EE NWATER LEVEL LIGHTGR EE NBIN SWITCH LIGHTREDHARVEST/SAFETY LIMIT LIGHT1C1FGR OUNDJUMP ERSV1621aFigure 6-26. Step 2Is water flowing into thewater trough?Step 2 Jumper wire connected from probe to groundThe Water Inlet ValveThe Water Level Light is:Solenoid Coil is:Causeno on De-Energized This is normal operation.Do not change any parts.yes on De-Energized The water inlet valve iscausing the problem.yes off Energized Proceed to step 3.Continued on next page …Part No. 80-1100-3 6-51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!