12.07.2015 Views

EAGLE CORR PE™ * - JM Eagle

EAGLE CORR PE™ * - JM Eagle

EAGLE CORR PE™ * - JM Eagle

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fabrication of an installation stub is necessary to prevent inadvertent damagewhile assembling the pipe joint. If the bell is not pushed on during theassembly process an installation stub is not necessary. An installation stubcan be fabricated on the job site in two ways.1. If a spigot of pipe (from the same diameter of pipe being assembled)is available, a short section of the spigot can be inserted into the belland used as an installation stub. At a minimum, this short section of thespigot will be cut in the valley of the fifth corrugation from the spigot endof the pipe.2. A second method of fabricating an installation stub uses a short sectionof pipe five full-size corrugations long. (Note: The outside diameterof the spigot corrugations are smaller than the outside diameter ofthe full size corrugations along the barrel of the pipe). Both ends of thepipe should cut in the valley of the corrugations. Fabricating this installationstub requires saw cutting a predefined width of the pipe (W) alongthe length of the short section of pipe (see Figure 15). The width of thesaw cut is dependent on the diameter of the pipe and is summarized inTable 2. Once the section of pipe is removed, the cut section can bepushed together and inserted into a bell.WWFigure 15<strong>EAGLE</strong> <strong>CORR</strong> PE INSTALLATION GUIDE25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!