12.07.2015 Views

EAGLE CORR PE™ * - JM Eagle

EAGLE CORR PE™ * - JM Eagle

EAGLE CORR PE™ * - JM Eagle

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Correct backfillCorrect backfillUse board or othertamping device to placeand compact backfillunder Use board haunch or other area.tamping device to placeand compact backfillunder haunch <strong>Eagle</strong> Corr area. PEWell placedinitial backfill in<strong>Eagle</strong> Corr PEhaunchingareaWell placedinitial backfill inhaunchingareaFigure 27Incorrect backfillIncorrect backfillVoid and low compactionin haunch area.Void and low compaction<strong>Eagle</strong> Corr PEin haunch area.Poorly placedinitial backfill in<strong>Eagle</strong> Corr PEhaunchingareaPoorly placedinitial backfill inhaunchingareaFigure 284.8 EMBEDMENT MATERIALSMaterials suitable for foundation and embedment are classified in the Tables6 and 7. They include a number of processed materials plus soil typesdefined according to the Unified Soil Classification System in ASTM D2487,“Standard Method for Classification of Soils for Engineering Purposes.”Table 7 provides recommendations on the installation and use based onclass of soil or aggregates and location within the trench. It is important toengineer all materials used in the pipe trench to work together and with thenative material surrounding the trench.44 <strong>EAGLE</strong> <strong>CORR</strong> PE INSTALLATION GUIDE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!