12.07.2015 Views

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Waukesha Cherry-Burrell InstallationCheck Pump RotationCheck rotation direction of drive to determine rotation direction of pump (Figure 25). After correct drive rotation isverified, connect coupling and assemble pump and coupling guards.NOTE: Pump covers in the following figures have been removed to view rotor rotation. Pump must never be operatedwith covers removed.Figure 25 - Upper Shaft Drive Flow, Lower Shaft Drive Flow and Vertical Porting Flowand Pump Rotation (Liquid End Shown)Revised: February 2007 95-03015 Page 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!