12.07.2015 Views

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

WAUKESHA Manuale Inglese AP2 - Asco Pompe Srl

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Waukesha Cherry-Burrell Maintenance3. Open valve in discharge line. Relief cover isset and will open if system pressure exceedspreset limit.D. Without pressure gauge in discharge line:1. Turn adjusting screw clockwise and observeproduct flow at discharge of system.When product flow reaches maximum or desired flowrate, lock adjusting screw with lock nut.3. PistonA. With pressure gauge and valve in discharge line:1. Close discharge valve slowly and observegauge pressure. DO NOT ALLOWPRESSURE TO EXCEED 200 PSI.2. Increase air/gas pressure, until desired reliefpressure registers on gauge. Lock air/gaspressure regulator adjusting screw with locknut.3. Open valve in discharge line. Relief cover isset and will open if system pressure exceedspreset limit.B. Without pressure gauge in discharge line:1. Increase air/gas pressure to relief valve, withregulator, and observe product flow atdischarge of system.When product flow reaches maximum or desired flowrate, lock regulator adjusting screw with lock nut.Revised: February 2007 95-03015 Page 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!