13.07.2015 Views

Bulletin (PDF 18.3 MB) - City of Armadale

Bulletin (PDF 18.3 MB) - City of Armadale

Bulletin (PDF 18.3 MB) - City of Armadale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Information <strong>Bulletin</strong> T6Information Items from the Technical Services DirectorateDepartment November 2010 December 2010 January 2011lanes on <strong>Armadale</strong> Road and left slip Westfield Road.Westfield.lane in Warton Road.• Tonkin Highway/Champion Drive – • Tonkin Highway/Champion Drive –• Railway Avenue/Streich Avenue/Rail traffic signals.traffic signals.Crossing modifications.• <strong>Armadale</strong>/Abbey/Railway – traffic • <strong>Armadale</strong>/Abbey/Railway – traffic• Railway Avenue – Merrifield tosignals.signals.Westfield Road.• Wungong Road – street lighting. • Nicholson Road – upgrade future dual• Seville Drive/Poad Street/Salamanca • Challis/Seville – new roundabout.carriageway.Boulevard – pre deflection on Seville • Nicholson Road – upgrade.• <strong>City</strong> and school parking arrangements.Drive (south approach).• Slab Gully Creek – new flow channel. • Canning Road – edge line design.• Tonkin Highway/Champion Drive –• Wungong Road – edge line design.Install traffic signals.• Westfield Road – street lighting.• <strong>Armadale</strong> Road/Abbey Road/Railway• Reilly Road – construction.Avenue – Intersection modifications,traffic signals.• Reilly Road – drainage channel.• Denny Avenue / Streich Avenueintersection modifications / trafficsignals.• Wungong Road – lighting.• Challis/Seville – install roundabout.• Slab Gully Creek – modify flowchannel.ParksReservesandCapital Works• Cross Park Working Group.• Equestrian Facilities Reference Group.• Urban Waterways Renewal Project.• Canning River Walk Trail.• Youth Activities Area planning.• Normalisation and Transition Planning– Champion Lakes.• POS Working Group – ‘Precinct I’.Capital Works• Cross Park Working Group.• Equestrian Facilities Reference Group.• Urban Waterways Renewal Project.• Canning River Walk Trail.• Youth Activities Area planning.• Normalisation and Transition Planning– Champion Lakes.Capital Works• Cross Park Working Group.• Equestrian Facilities Reference Group.• Urban Waterways Renewal Project.• Canning River Walk Trail.• Youth Activities Area planning.• Normalisation and Transition Planning– Champion Lakes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!