13.07.2015 Views

Half-yearly financial Report at June 30, 2013 - A2A

Half-yearly financial Report at June 30, 2013 - A2A

Half-yearly financial Report at June 30, 2013 - A2A

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Half</strong>-<strong>yearly</strong> <strong>financial</strong> report <strong>at</strong> <strong>June</strong> <strong>30</strong>, <strong>2013</strong>Risks and uncertaintiesThe oper<strong>at</strong>ional implement<strong>at</strong>ion of the policy is carried out through the use of anEnvironmental Management System (EMAS) by those oper<strong>at</strong>ing entities of the Group whichare more exposed to both direct and indirect potential environmental impact. This systemprovides for a program of progressive extension and upgrading to the standards of ISO14001certific<strong>at</strong>ion for those of the Group's main activities having a gre<strong>at</strong>er impact on theenvironment, as well as the management of EMAS certific<strong>at</strong>ion for the Group's main plants.The Edipower plants are UNI EN ISO 14001 certified and as of today all hold the EMAScertific<strong>at</strong>ion. For the purpose of arriving <strong>at</strong> a single model, measures are being taken, now <strong>at</strong>the completion stage, which will allow all the oper<strong>at</strong>ing companies of the Group to refer to asingle, integr<strong>at</strong>ed Quality, Environment and Safety system.In addition, organiz<strong>at</strong>ional control units have been set up which among other things carry outperiodic environmental analyses alongside periodic audits to detect and prevent any conductth<strong>at</strong> does not comply with the environmental procedures established for all of the Group’soper<strong>at</strong>ing companies. From the perspective of having a constant evolution of the systemscontrolling environmental risk, the Group has joined the ARPA (Regional Agency for theProtection of the Environment) Lombardy Project, whose purpose is to improve theefficiency of the system for controlling the more significant emissions, also in the light oftechnical developments in the sector, by connecting all the Emission Monitoring Systems(SMEs) to a single control center.225The <strong>A2A</strong> Group has taken out insurance cover against damage arising from both accidentaland gradual pollution in order to cover any residual environmental risk, meaning againstevents caused by a sudden and unpredictable fact and in the case of environmental damageinherent in the continuous exercising of activities.Each year the Group publishes a Sustainability <strong>Report</strong> which reports key d<strong>at</strong>a and inform<strong>at</strong>ionon the environmental and social aspects connected with the Group’s activities. TheSustainability <strong>Report</strong> conforms to standard GRI-G3.1 issued by the Global <strong>Report</strong>ing Initi<strong>at</strong>iveand since 2010 has been certified by the auditors. In line with Group practice, Edipower S.p.A.also publishes an annual Sustainability <strong>Report</strong>.Inform<strong>at</strong>ion technology riskThe activities of the <strong>A2A</strong> Group are managed through complex ICT systems which support themain business processes: oper<strong>at</strong>ional, administr<strong>at</strong>ive and commercial. Potential risk factorsinclude the inadequacy of such systems compared to business needs or the failure to keepthese upd<strong>at</strong>ed, possible “downtime” making the systems unavailable and the inadequ<strong>at</strong>ehandling of the aspects linked to the integrity and confidentiality of inform<strong>at</strong>ion. These risk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!