13.07.2015 Views

Half-yearly financial Report at June 30, 2013 - A2A

Half-yearly financial Report at June 30, 2013 - A2A

Half-yearly financial Report at June 30, 2013 - A2A

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Half</strong>-<strong>yearly</strong> <strong>financial</strong> report <strong>at</strong> <strong>June</strong> <strong>30</strong>, <strong>2013</strong>Innov<strong>at</strong>ion, development and researchincreased number of hours worked in cogener<strong>at</strong>ion mode in the summer months by the 5MWe nominal power turbogas equipment loc<strong>at</strong>ed in the Via Rossi district he<strong>at</strong>ing plant.The total savings achieved in this way will count towards the issue of white certific<strong>at</strong>es (EnergyEfficiency Allowances).<strong>A2A</strong> S.p.A. goes for electric mobility<strong>A2A</strong> S.p.A. has for a long time been involved in an electric mobility project, known as e-moving,which it promotes in conjunction with Renault and the municipal administr<strong>at</strong>ions of Bresciaand Milan together with a number of priv<strong>at</strong>e companies which have joined in the testing.<strong>A2A</strong> S.p.A. is the promoter and coordin<strong>at</strong>or of the initi<strong>at</strong>ive and has built the infrastructure forelectric car recharging in the municipalities of Milan and Brescia, while Renault has provided47 vehicles from its zero emission range (saloon cars and small vans) which are equipped withthe l<strong>at</strong>est gener<strong>at</strong>ion lithium-ion b<strong>at</strong>teries.240The two Lombardy municipalities have set out to become the reference cities for electricmobility in Italy, being the first, in conjunction with <strong>A2A</strong>, to begin developing an entire cuttingedgestructured electric recharging network: a total of 270 recharging points, of which 100public points in Milan and Brescia (roads, parking lots etc.). Priv<strong>at</strong>e individuals owning theirown electric vehicle (car/scooter) can apply for a card allowing them to top up with electricity<strong>at</strong> the public columns by visiting the dedic<strong>at</strong>ed portal www.e-moving.it.The objective of e-moving is to test every component of the electric mobility oper<strong>at</strong>ing model:the technology and the loc<strong>at</strong>ing of the recharging infrastructure, the processes andcommercial solutions, the interaction between the recharging network and the vehicles, thesupply of energy, the billing systems, b<strong>at</strong>tery management and car maintenance.The e-moving project has today turned out to be the most complete and advanced pl<strong>at</strong>formwithin the sphere of the testing being promoted by the AEEG (the Electricity and GasAuthority) to identify the model to be used for developing public recharging systems. Testingwith the AEEG will continue until 2015, with the d<strong>at</strong>a and experiences of this first phase, whichhas been in progress for more than two years now, being shared on a half-<strong>yearly</strong> basis. In thelast half year two separ<strong>at</strong>e discussion tables were set up with ENEL and Repower to make theinter-operability of the public recharging infrastructure and the recharging cards usable byend customers effective, as the AEEG requires of electric vehicle public recharging systems.Reduction of nitrogen oxides <strong>at</strong> the Brescia waste to energy plantFollowing the start of the industrial use of the new high-dust c<strong>at</strong>alyzers on all threecombustion lines <strong>at</strong> the end of 2010 (an initi<strong>at</strong>ive included in a European research project

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!