13.07.2015 Views

condair oem

condair oem

condair oem

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.3.5 Inspecting the steam installationUse the following check list to ascertain that the steam installation was performed correctly:– Steam distribution pipeSteam distribution pipe correctly positioned and secured (screws tightened)?Are the outlet orifices at right angles to the air flow direction?– Steam hoseMaximum length of 4 m?Minimum bend radius of 300 mm (4-5 x internal diameter with fixed piping)?Have the instructions for hose positioning been followed?Steam hose: no sagging (condensate pocket)?Rigid steam lines: properly insulated? Correct installation material used? Minimum internal diametermaintained?Steam hose securely attached with clamps?Heat expansion during operation and shortening of the hose with ageing taken into consideration?– Condensate hoseDownslope of at least 20 %?Siphon existing and filled with water?Condensate hose correctly fixed?26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!