13.07.2015 Views

condair oem

condair oem

condair oem

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6 Operation6.1 Operational safety instructions– Initial commissioning: Before the steam humidifier is put into operation for the first time,all installations and the unit configuration must be inspected by the responsiblepersons to see that everything is correct (see also checklist for the individual installations).Any defects must be expertly dealt with before commissioning.– The Condair OEM steam humidifier may only be started and operated by persons whoare familiar with the unit and who have adequate qualifications for this work. Checkingthis qualification is the customer’s concern.– Warning - danger of electric shock! Before actuating the service switches of thepower supply lines (heating and control voltage) to the Condair OEM make sure theunit incorporating the Condair OEM (e.g. air conditioning cabinet) is duly closed andno live parts can be touched.6.2 Display and operating elementsThe figure below shows the display and operating elements of the ECCM control unit (available asan option). The ECCM control unit allows the connection of a drain key and an On/Off switch. Pleaseconsult the instructions supplied with the control unit.ECCM control unit1 On/Off switch2 Drain/info key5433 Error display (red LED)4 Warning and information display (yellow LED)5 Steam production display (green LED)1232

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!