13.07.2015 Views

Warrawee Substation - Submissions Report - Transport for NSW ...

Warrawee Substation - Submissions Report - Transport for NSW ...

Warrawee Substation - Submissions Report - Transport for NSW ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 Statement of CommitmentsThe <strong>Warrawee</strong> <strong>Substation</strong> REF was placed on public exhibition from 3 May 2012 to 7 June2012. It contained a list of control measures that must be adhered to in order to adequatelymitigate the identified potential environmental impacts such that they are not significant.Any issues identified through the exhibition period have been responded to in this report andon an individual basis, with all commitments made documented in this section.The Statement of Commitments chapter is written to document these controls identifiedthrough the REF and submissions responses. These commitments outline the preconstruction,construction and operational phase measures that RailCorp will carry out.4.1 General4.1.1 Terms of ApprovalThe Project must be carried out in accordance with the:(a) The <strong>Warrawee</strong> <strong>Substation</strong> REF;(b) These Conditions of Approval.In the event of any inconsistency with the proposal as described in (a) or (b) these Conditionswill prevail.4.1.2 Statutory ComplianceThese Conditions do not replace the obligations to obtain all other licences, permits andapprovals that required by law to be obtained and maintained in respect to this Project.4.1.3 Limits of ApprovalThis Approval must lapse after 5 years after the date on which the determination was granted,unless the works that are subject are substantially commenced on or be<strong>for</strong>e that time.4.1.4 StagingRailCorp may elect to construct the project in stages. Where this occurs the Proponent mustdetail how compliance with the Conditions will be ensured across and between the stages ofthe Project.4.2 Communications4.2.1 Community Notification and LiaisonThe Prior to the commencement of construction, the community is to be notified of works tobe undertaken outside the hours of 7:00 am to 6:00 pm (Monday to Friday) and 8:00 am toPage 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!