4.13.2 GraffitiHoardings, site sheds, fencing and any structures built as part of the project are to bemaintained free of graffiti during the construction period. Any offensive graffiti in the railcorridor is to be removed in a timely manner. If removal requires track access it will beremoved when operational requirements permit.Page 32