13.07.2015 Views

Warrawee Substation - Submissions Report - Transport for NSW ...

Warrawee Substation - Submissions Report - Transport for NSW ...

Warrawee Substation - Submissions Report - Transport for NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Glossary of termsCEMPConstruction Environmental Management PlanOEHOffice of Environment and Heritage, <strong>for</strong>merly Department ofEnvironment, Climate Change and WaterEP&A Act Environmental Planning and Assessment Act, 1979OEMPOperational Environmental Management PlanPERProject Environmental RepresentativePOEO Act Protection of the Environment Operations Act, 1997EDDExempt Development DocumentationTMPTraffic Management PlanWMPWaste Management PlanConditionsThese Conditions of Approval, as provided in this document.ConstructionIncludes all work in respect of the Project, other than thoseactivities determined by the PER to have minimalenvironmental impact.Emergency WorkIncludes works to avoid the loss of life, damage to property,utilised and infrastructure, prevent immediate harm to theenvironment, contamination of land or damage to a heritageitem (either Aboriginal or non-indigenous)Environmental Assessment The document(s) as described in Condition 1 which fulfil therequirements of Environmental Assessment under theEnvironmental Planning and Assessment Act, 1979.ProjectThe scope of work and activities as detailed in theEnvironmental Assessment.ProponentA person or body proposing to carry out an activity under Part5 of the EP&A Act or under Part 3A of the EP&A Act.RailCorp is the Proponent of this Project.Reasonable and Feasible Feasible relates to engineering considerations and what ispractical to build. Reasonable relates to the application ofjudgement in arriving at a decision, taking into account:mitigation benefits, cost of mitigation versus benefitsprovided, community views and nature and extent of potentialimprovements.Sensitive ReceiverResidence, education institution, health care facility, religiousfacility and children’s day care facility.Track PossessionA period of time, usually weekends and/or night time periods,when train services are suspended, and power is turned offon the overhead wires.33kV FeedersFeeders are cables which connect electrical infrastructuretogether, there is an existing feeder that runs through<strong>Warrawee</strong> which is at a voltage of 33kV.SwitchboardsSwitchboards contain circuit protective devices.In an electric power system, switchboard is the combinationof electrical disconnect switches, fuses or circuit breakersused to control, protect and isolate electrical equipment.SwitchgearSwitchgear is used both to de-energize equipment to allowwork to be done and to clear faults downstream. This type ofequipment is important because it is directly linked to thereliability of the electricity supply.DC RectifiersRectifiers are used to change AC voltage to DC voltage. Ourtrain network operates on DC voltage.Circuit BreakersProtection devices used in electrical infrastructure to preventover current.Auxiliary Trans<strong>for</strong>mers Auxiliary Trans<strong>for</strong>mers are used in RailCorp to provide mainsvoltage <strong>for</strong> the operation of auxiliary devices such as batterychargers and protection devices.0.5mH 4000A Reactor Reactors are protection devices used in Traction substations.Harmonic FilterHarmonic filters are used to moderate harmful currents whichPage ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!