CORRECTIVE MAINTENANCE SHEETSHEET C015 Sheet 1/1REPLACING THE BUZZERCaution!Do not use the machineduring maintenanceoperations.1 - Preliminary operations• Cut off the electric power supply (see § 7.3, page 52).2 - Remove the buzzer• Mark and disconnect the buzzer’s electric connections (1).• Remove the buzzer by unscrewing the fixing bolt.3 - Replacing the buzzer• Put the new buzzer into place and secure with the fixing bolt.• Reconnect the electric conections according to the marks made when dismantling.4 - Test• Put the machine back into the operational configuration.• Check that the buzzer gives a signal below 1.5 metres (or 4ft92in) duringlowering.1Compact1Optimum

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!