13.07.2015 Views

general recommendations - safety - AJ Maskin AS

general recommendations - safety - AJ Maskin AS

general recommendations - safety - AJ Maskin AS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SHEET C017CORRECTIVE MAINTENANCE SHEETREPLACING THE REMOTE CONTROLSheet 1/21 - Preliminary operations• Put the machine in the maintenance configuration (see § 7.2, page 51).• Cut off the electric power supply (see § 7.3, page 52).2 - Removing the remote control• Remove the protective plate (4) of the chassis control station (for Compactmachines).• Release the manual control cable (2) of the covered distributing valve on thelifting cylinder.• Unscrew the plate sheath stop (3) supporting the cable.• Mark the cable route in the scissor ducts and remove the cable from theducts.• Unscrew the blocking nut of the emergency pull (1) and remove the pull andcable assembly.4Compact2 31 1CompactOptimum3 - Replacing the remote control• Put the remote control cable back into place in the scissor ducts, according tothe route marked when dismantling.• Put the emergency pull (1) in place on the chassis and secure with the blockingnut.• Screw the sheath stop onto the cable support plate (3) at the distributingvalve level.• Secure the cable to the distributing valve manual control.• Put the chassis control panel protective plate (4) back into place (for Compactmachines).• Put the machine back into the operational configuration.• Raise the platform to a height of 2m (or 6ft56in) and activate the emergencypull to check that it works properly.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!