13.07.2015 Views

P.13A-6 - LIL EVO

P.13A-6 - LIL EVO

P.13A-6 - LIL EVO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13A-76MULTIPORT FUEL INJECTION (MFI)MULTIPORT FUEL INJECTION (MFI) DIAGNOSISCONNECTOR: B-105STEP 2. Measure the sensor output voltage at barometricpressure sensor connector B-105 by backprobing.(1) Do not disconnect connector B-105.(2) Turn the ignition switch to the "ON" position.B-105 (B)7 6 5 4 3 2 1HARNESS CONNECTOR:COMPONENT SIDEAK203496ABB-105 HARNESSCONNECTOR:HARNESS SIDE1 2 3 4 5 6 7AKX01520AH(3) Measure the voltage between terminal No. 2 and ground bybackprobing.• When altitude is 0 m (0 foot), voltage should measure3.7 and 4.3 volts.• When altitude is 600 m (1,969 feet), voltage shouldmeasure 3.4 and 4.0 volts.• When altitude is 1,200 m (3,937 feet), voltage shouldmeasure 3.2 and 3.8 volts.• When altitude is 1,800 m (5,906 feet), voltage shouldmeasure 2.9 and 3.5 volts.(4) Turn the ignition switch to the "LOCK" (OFF) position.Q: Is the measured voltage within the specified range?YES : Go to Step 3.NO : Go to Step 5.TSB Revision

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!