13.07.2015 Views

PT Series Operator & Parts Manual - McConnel

PT Series Operator & Parts Manual - McConnel

PT Series Operator & Parts Manual - McConnel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNPACKING THE MACHINE – <strong>PT</strong>270 ModelsWARNING: Only use approved lifting equipment which is correctly fastened to the machine -this will increase your personal safety. Failure to follow the safety instructions could resultin accidents and serious injuries.Using a ForkliftAccess to two fork guides are providedthrough the lift arm channels at the front ofthe machine. This enables movement ofthe complete unit by forklift.Forklift lifting points – through lift arm channels.Remove <strong>PT</strong>O shaft from its storage position.Remove stacking / transport legs (if fitted).Remove blade restrainer wires / cable ties.On despatch from the factory the rotors and blades of the machine will be secured withrestraining wires and/or cable ties to stop them moving during delivery; these restrainingwires must be removed before using the machine.WARNING: Before attempting to access the underside of the machine, ensure it isadequately and safely supported. Do not rely on the tractor’s hydraulics. Use safetysupports that have a minimum Safe Working Load (SWL) of 1.5 tonnes.With the machine suitably supported, remove all rotor and blade restraining wires and/or ties.Inspect the underside of the machine to ensure it is undamaged, and check all blades rotatefreely and do not foul on the body.14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!