13.07.2015 Views

PT Series Operator & Parts Manual - McConnel

PT Series Operator & Parts Manual - McConnel

PT Series Operator & Parts Manual - McConnel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATTACHING THE MACHINE – <strong>PT</strong>270 ModelsAttachment of the machine should be performed on a firm level site - the procedure forattachment is as follows;Remove the two Cat II link pins and reverse thetractor up to the machine - adjust the height ofthe lift arms so they align with the pin holes onthe machine.Carefully reverse the tractor fully in to locate thelift arms within the receiving channels of themachine and attach in position using the Cat IIpins supplied. The machine has 3 pin positions –select the one that gives approximately 50mmclearance between lower lift arm and machine.NOTE: An insufficient amount of clearance will prevent the machine from ‘floating’ correctly.Start the tractor and raise the machine on the lift arms until the gearbox <strong>PT</strong>O shaft of the machineand the tractor’s <strong>PT</strong>O drive are at their shortest distance apart. Turn off the tractor, apply the parkingbrake and remove the starter key.Adjust the tractor stabiliser chains/bars so thereis no lateral movement when the machine is inthe raised position.Connect the end of the <strong>PT</strong>O shaft that has theshear bolt to the machine’s gearbox. Secure the<strong>PT</strong>O guard retraining chain to a suitable locationon the machine.20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!