13.07.2015 Views

Tab 36

Tab 36

Tab 36

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>36</strong>.3Adjustable Frequency DrivesSVX9000 Drives<strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong>Motor ProtectionDV/DT and Peak Motor Voltage SolutionsToday’s AFD products offersignificantly improvedperformance, but at thepotential cost of motorinsulation stress. The fastswitching time of the IGBTdevices used in newer AFDscan cause a transmission lineeffect in the output powerleads to the motor, leading topossibly damaging voltagelevels. To meet this need,NEMA has introduced amotor in MG1, Part 31, whichprovides an insulation systemdesigned to maintain normalmotor life in AFDapplications. For existingmotors, a motor protectionscheme is required for longercable runs. Eaton offers threestandard solutions for existingsystems.●MotoRx This solutionprovides an energyrecovery system whichclamps the peak motorvoltage to a safe levelfor standard motors. Thisoption is used when thedistance between a singlemotor and the drive is600 ft or less.●Output Line Reactor Thisoption provides an outputline reactor, reducing theDV/DT of the AFD outputvoltage and lessening thetransmission line effect, tolower the peak voltage atthe motor terminals.<strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong>Product Availability CodesThe product availability codesindicate the type of facility(warehouse, Mod Center orfactory) that the product willship from and, if it is not instock, the number of workingdays needed to assemble theproduct from receipt of theorder to shipment from thedesignated facility. Pleasenote that this lead-time doesnot include any in-transit timefrom our facility to yourfacility.Product Availability CodesCodeDescriptionWWarehouse stocked item. Shipped on customer request date. If item is backordered, please check Vista/VISTALINE or contactyour Customer Support Center for product availability.F1Factory assemble-to-order. Shipped from factory within 1 working day after receipt of order on Vista.FAFactory assemble-to-order. Shipped from factory within 2–3 working days after receipt of order on Vista.FBFactory assemble-to-order. Shipped from factory within 4–10 working days after receipt of order on Vista.FCFactory assemble-to-order. Shipped from factory within 11–15 working days after receipt of order on Vista.FDFactory assemble-to-order. Shipped from factory within 16–20 working days after receipt of order on Vista.<strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong>FPMAMBMPFactory assemble-to-order. Shipped from factory on negotiated promise date.Mod Center assemble-to-order. Shipped from Mod Center within 1–3 working days after receipt of order on Vista.Mod Center assemble-to-order. Shipped from Mod Center within 4–10 working days after receipt of order on Vista.Mod Center assemble-to-order. Shipped from Mod Center on negotiated promise date.Product availability codescontained herein for a givenproduct may be quantitysensitive and are subject tochange without notice.For the most currentinformation, refer to theProduct Identification Inquiry(PIN) screen on Vista.<strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong><strong>36</strong>V6-T<strong>36</strong>-16Volume 6—Solid-State Motor Control CA08100007E—April 2011 www.eaton.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!