13.07.2015 Views

Bursting and Spalling in Pretensioned U-Beams - Ferguson ...

Bursting and Spalling in Pretensioned U-Beams - Ferguson ...

Bursting and Spalling in Pretensioned U-Beams - Ferguson ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Correspondence between the values of prestress<strong>in</strong>g force measured by thedifferent methods was good (3.7% mean discrepancy between methods) <strong>and</strong> less than the5% code maximum (ACI 318, 2008, Provision 18.20.1). Precision improved dur<strong>in</strong>g thesecond beam cast, with the error halved (1.4% discrepancy). The reported prestress<strong>in</strong>gforce applied for each beam represents the mean prestress<strong>in</strong>g force associated withmeasurements of ram pressure <strong>and</strong> str<strong>and</strong> elongation.3.6.4 Beam Cast<strong>in</strong>gAfter the str<strong>and</strong>s were fully tensioned, the beams could be cast. A similarprocedure to that observed at the precast-beam fabricator (Section 3.6.1) was used; a fewparticulars of the cast<strong>in</strong>g process used at the <strong>Ferguson</strong> Laboratory are noted.Concrete for the U-beams was provided by Coreslab Structures, as previouslydiscussed <strong>in</strong> Section 3.3.1. After batch<strong>in</strong>g, this concrete was loaded <strong>in</strong>to mix<strong>in</strong>g trucksrented from a local ready-mix concrete provider <strong>and</strong> transported to the laboratory(approximately 15 miles). Because of the journey, <strong>and</strong> concerns about concrete flashsett<strong>in</strong>g<strong>in</strong> the trucks, chemical retarder (5 oz/Cwt) was <strong>in</strong>corporated <strong>in</strong> the concretemixture design (Table 3.1).When the concrete trucks arrived at the laboratory, the concrete slump wasmeasured as shown <strong>in</strong> Figure 3.43. High-slump concrete (9 <strong>in</strong>. goal) was desired for easyplacement of the concrete, particularly <strong>in</strong> the bottom flange, congested by the largenumber of prestress<strong>in</strong>g str<strong>and</strong>s used. If trucks arrived with low-slump concrete, water<strong>and</strong>/or superplasticizer could be mixed <strong>in</strong> before placement.A large number of cyl<strong>in</strong>ders were cast alongside the beams (Figure 3.44). A totalof 48 cyl<strong>in</strong>ders were match-cured to locations <strong>in</strong> the beam, with the majoritycorrespond<strong>in</strong>g to the “release po<strong>in</strong>t” <strong>and</strong> “hot spot” locations (described previously <strong>in</strong>140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!