- Page 1 and 2: WORLD BANK OPERATIONS EVALUATION DE
- Page 3 and 4: OPERATIONS EVALUATION DEPARTMENTENH
- Page 5: Bridging Troubled Waters: Assessing
- Page 9 and 10: Bridging Troubled Waters: Assessing
- Page 11 and 12: Bridging Troubled Waters: Assessing
- Page 13 and 14: Bridging Troubled Waters: Assessing
- Page 15 and 16: Bridging Troubled Waters: Assessing
- Page 18 and 19: ENGLISHEXECUTIVESUMMARYIn 1997 more
- Page 20 and 21: Executive Summaryguided Bank involv
- Page 22 and 23: Executive Summaryis now significant
- Page 24 and 25: Executive SummaryBank Water Resourc
- Page 26 and 27: Executive Summarymendados por el DE
- Page 28 and 29: ABBREVIATIONS AND ACRONYMSADBAFRAPL
- Page 30 and 31: 1The 1993 Strategy—Still Relevant
- Page 32 and 33: The 1993 Strategy—Still Relevant
- Page 34 and 35: The 1993 Strategy—Still Relevant
- Page 36 and 37: 2The Bank’s WaterAssistance and P
- Page 38 and 39: The Bank’s Water Assistance and P
- Page 40 and 41: The Bank’s Water Assistance and P
- Page 42 and 43: The Bank’s Water Assistance and P
- Page 44 and 45: 3The Water Strategy Has BeenOnly Pa
- Page 46 and 47: The Water Strategy Has Been Only Pa
- Page 48 and 49: The Water Strategy Has Been Only Pa
- Page 50 and 51: The Water Strategy Has Been Only Pa
- Page 52 and 53: The Water Strategy Has Been Only Pa
- Page 54 and 55: The Water Strategy Has Been Only Pa
- Page 56 and 57:
The Water Strategy Has Been Only Pa
- Page 58 and 59:
Bridging Troubled Waters: Assessing
- Page 60 and 61:
Bridging Troubled Waters: Assessing
- Page 62 and 63:
Bridging Troubled Waters: Assessing
- Page 64 and 65:
Bridging Troubled Waters: Assessing
- Page 66 and 67:
Bridging Troubled Waters: Assessing
- Page 68 and 69:
Bridging Troubled Waters: Assessing
- Page 70 and 71:
Bridging Troubled Waters: Assessing
- Page 73 and 74:
ANNEX B:METHODOLOGY1. Study Design
- Page 75 and 76:
Annexesinstitutional capacities, an
- Page 77 and 78:
Annexesprojects, and reflect divers
- Page 79:
Annexes• A series of informal wor
- Page 82 and 83:
Bridging Troubled Waters: Assessing
- Page 84 and 85:
Bridging Troubled Waters: Assessing
- Page 87 and 88:
ANNEX D:ASSESSING WATER PROJECT DES
- Page 89 and 90:
Annexes• Is the water service org
- Page 91 and 92:
AnnexesFigure D.1W ater Policy Revi
- Page 93 and 94:
AnnexesFigure D.2W ater Policy Revi
- Page 95 and 96:
AnnexesComprehensive managementInst
- Page 97 and 98:
AnnexesComprehensive managementInst
- Page 99 and 100:
AnnexesComprehensive managementInst
- Page 101 and 102:
AnnexesComprehensive managementInst
- Page 103 and 104:
AnnexesComprehensive managementInst
- Page 105:
AnnexesComprehensive managementInst
- Page 108 and 109:
Bridging Troubled Waters: Assessing
- Page 110 and 111:
Bridging Troubled Waters: Assessing
- Page 112 and 113:
Bridging Troubled Waters: Assessing
- Page 114 and 115:
Bridging Troubled Waters: Assessing
- Page 116 and 117:
Bridging Troubled Waters: Assessing
- Page 118 and 119:
Bridging Troubled Waters: Assessing
- Page 120 and 121:
Bridging Troubled Waters: Assessing
- Page 122 and 123:
Bridging Troubled Waters: Assessing
- Page 124 and 125:
Bridging Troubled Waters: Assessing
- Page 126 and 127:
Bridging Troubled Waters: Assessing
- Page 128 and 129:
100T able G.1Cross-tabulation of th
- Page 130 and 131:
Bridging Troubled Waters: Assessing
- Page 132 and 133:
ENDNOTESChapter 11. This document w
- Page 134 and 135:
Endnotesthat recommendations are re
- Page 136 and 137:
BIBLIOGRAPHYAbernethy, Charles L.,
- Page 138 and 139:
BibliographyFox, James. 2000. “Ap
- Page 140 and 141:
BibliographyMillington, Peter. 2000
- Page 142 and 143:
Bibliographyagement. ISPAN, Bureau