17.07.2015 Views

Strategic Guidance on the Management of LLW and ILW / LLW ...

Strategic Guidance on the Management of LLW and ILW / LLW ...

Strategic Guidance on the Management of LLW and ILW / LLW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>LLW</strong> Repository LtdNati<strong>on</strong>al Waste ProgrammeNWP/REP/011Issue 2.1 – Jan 2013Page 38 <strong>of</strong> 585.2.9. Optimised Disposal to Low Level Waste Repository (<strong>LLW</strong>R)Usage<strong>LLW</strong><strong>ILW</strong>/<strong>LLW</strong>Surface c<strong>on</strong>taminatedVolumetricallyc<strong>on</strong>taminatedActivatedAluminiumCopperMild steelMild steel (coated)Stainless steelStainless steel (coated)Descripti<strong>on</strong> <strong>of</strong> techniqueOptimised disposal is a methodology which facilitates disposal at <strong>the</strong> Low Level Waste Repository involving<strong>the</strong> disposal <strong>of</strong> two or more wastestreams in <strong>the</strong> same disposal volume, so as to maximise <strong>the</strong> use <strong>of</strong> <strong>the</strong>disposal volume capacity <strong>and</strong> minimise <strong>the</strong> use <strong>of</strong> inactive grout infill. This methodology is most useful, in<strong>the</strong> c<strong>on</strong>text <strong>of</strong> p<strong>on</strong>d furniture, for <strong>the</strong> management <strong>of</strong> p<strong>on</strong>d skips <strong>and</strong> c<strong>on</strong>tainers for which o<strong>the</strong>r wastemanagement approaches are not suitable <strong>and</strong> for which size reducti<strong>on</strong> is not practicable. Optimiseddisposal would involve such skips or c<strong>on</strong>tainers being transferred into an appropriate disposal c<strong>on</strong>tainer;<strong>and</strong> <strong>the</strong> voidage within <strong>the</strong> p<strong>on</strong>d skips or c<strong>on</strong>tainers filled with additi<strong>on</strong>al different radiologicallyc<strong>on</strong>taminated wasteforms <strong>and</strong> cementitious grout. The voidage around <strong>the</strong> skips or c<strong>on</strong>tainers within <strong>the</strong>disposal c<strong>on</strong>tainer is similarly filled with <strong>the</strong> waste / grout mixture or different additi<strong>on</strong>al wastes, ei<strong>the</strong>r allfrom <strong>the</strong> same waste producer or a mixture from different waste producers. The disposal c<strong>on</strong>tainer is <strong>the</strong>ntransferred to <strong>the</strong> <strong>LLW</strong>R for final grouting <strong>and</strong> dispositi<strong>on</strong>.It should be noted that this management approach, as it requires waste disposal at <strong>the</strong> <strong>LLW</strong>R, should bec<strong>on</strong>sidered as a last resort <strong>and</strong> would involve significant assessment by <strong>LLW</strong>R Ltd. The use <strong>of</strong> thisapproach would <strong>on</strong>ly be deemed acceptable where every reas<strong>on</strong>ably practicable effort has been made toemploy alternative c<strong>on</strong>diti<strong>on</strong>ing, treatment <strong>and</strong> disposal routes.This approach would be suitable for all waste types <strong>and</strong> potentially for <strong>ILW</strong> / <strong>LLW</strong> borderline wastes; butwould require significant up-fr<strong>on</strong>t dialogue with <strong>LLW</strong>R Ltd.Outcomes Advantages Disadvantages• Waste transferred to <strong>LLW</strong>R for finaldispositi<strong>on</strong>,• Optimised use <strong>of</strong> disposal volume.• Sec<strong>on</strong>dary wastes dependent <strong>on</strong>wasteforms included in optimised disposalmodel.A company owned by UK Nuclear Waste <strong>Management</strong> Ltd• Useful for situati<strong>on</strong>swhere size reducti<strong>on</strong><strong>and</strong> o<strong>the</strong>rmanagementapproaches are notpracticable.• Optimises use <strong>of</strong> <strong>the</strong>disposal volume at<strong>LLW</strong>R.• Requires disposal <strong>of</strong>waste at <strong>LLW</strong>R, usingvaluable disposalcapacity.• Removesopportunities forbeneficial re-use <strong>of</strong>metal.NOT PROTECTIVELY MARKED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!