- Page 2:
This page is intentionally left bla
- Page 9:
Figure 32: Age Pyramid of the 131 N
- Page 12 and 13:
new company called Uniper. And in A
- Page 14 and 15:
Reactor Status and Nuclear Programs
- Page 16 and 17:
in 2015. Historic analysis shows th
- Page 18 and 19:
Olympic swimming pools. A groundwat
- Page 20 and 21:
"For all intents and purposes, AREV
- Page 22 and 23:
On 8 June 2015, the U.S. utility in
- Page 24 and 25:
The world’s nuclear statistics re
- Page 26 and 27:
According to the latest assessment
- Page 28 and 29:
first in which there was zero nucle
- Page 30 and 31:
definitive closure of the Indian re
- Page 32 and 33:
Table 1: Nuclear Reactors “Under
- Page 34 and 35:
and ‐4 in Ukraine are approaching
- Page 36 and 37:
Figure 9: Construction Starts in th
- Page 38 and 39:
ecent design and compliant with sig
- Page 40 and 41:
clear that the 3/11 events had an i
- Page 42 and 43:
Figure 15: The 40‐Year Lifetime P
- Page 44 and 45:
Bangladesh, Belarus, Turkey, UAE, a
- Page 46 and 47:
eports on the faulty components’
- Page 48 and 49:
January 2015, both the Chamber of T
- Page 50 and 51:
conditions of financing and partici
- Page 52 and 53:
of the contract, with Rosatom cover
- Page 54 and 55:
start construction in the next 2-3
- Page 56 and 57:
In the late 1990s, the nuclear indu
- Page 58 and 59:
AES‐2006 have received orders, wh
- Page 60 and 61:
shortage of skilled labor; quality
- Page 62 and 63:
use of passive features in the EPR
- Page 64 and 65:
there have been a number of other i
- Page 66 and 67:
standardize. Without standardizatio
- Page 68 and 69:
Leningrad‐2‐1 Russia AES‐2006
- Page 70 and 71:
ut noted that these “had varying
- Page 72 and 73:
(IRIS) design. The design started i
- Page 74 and 75:
or early 2013. 219 In 2011, it was
- Page 76 and 77:
national energy bureau around two w
- Page 78 and 79:
scale they would manage to lower th
- Page 80 and 81:
The top of the reactor building of
- Page 82 and 83:
TEPCO and the Government are planni
- Page 84 and 85:
out that TEPCO’s lax management o
- Page 86 and 87:
physical condition or suicide (“e
- Page 88 and 89:
In March 2015, Fukushima Prefecture
- Page 90 and 91:
“Rising long‐term natural gas p
- Page 92 and 93:
projects came in at an average of U
- Page 94 and 95:
Figure 20: Wind, Solar and Nuclear,
- Page 96 and 97:
to rapidly accelerate the use of lo
- Page 98 and 99:
• In Germany, renewables provided
- Page 100 and 101:
target is undoubtedly ambitious, bu
- Page 102 and 103:
Annex 1: Overview by Region and Cou
- Page 104 and 105:
U.S. that have “shown interest in
- Page 106 and 107:
The construction of Angra‐3 was s
- Page 108 and 109:
project boosted the nameplate capac
- Page 110 and 111:
Shuttering old, uneconomic reactors
- Page 112 and 113:
In the case of Vogtle, a report for
- Page 114 and 115:
limit their competitiveness to meet
- Page 116 and 117:
generation projects in oversupplied
- Page 118 and 119:
identified and solved will we allow
- Page 120 and 121:
commercial operation only on 31 Dec
- Page 122 and 123:
TEPCO that its staff had deliberate
- Page 124 and 125:
produce plutonium for use in MOX fu
- Page 126 and 127:
Power's Takahama‐3 and ‐4, with
- Page 128 and 129:
Kansai Electric, along with Kyushu
- Page 130 and 131:
permanent closure of five reactors
- Page 132 and 133:
contractor and China Nuclear Indust
- Page 134 and 135:
in May 2013, when the NSSC, followi
- Page 136 and 137:
The political consequences of the m
- Page 138 and 139:
The European Union 28 member states
- Page 140 and 141:
In the absence of any successful ne
- Page 142 and 143:
of the serious concerns by a range
- Page 144 and 145:
negative outlook, “owing to conti
- Page 146 and 147: The average age of France’s power
- Page 148 and 149: EDF shares lost up to 85 percent of
- Page 150 and 151: power output is expected to rise si
- Page 152 and 153: low 639 , and coal‐fired generati
- Page 154 and 155: under construction. It was therefor
- Page 156 and 157: utilize the fuel that it obtained b
- Page 158 and 159: opinion at any of the sites propose
- Page 160 and 161: In Bulgaria, nuclear power provided
- Page 162 and 163: criteria defined in the tender”.
- Page 164 and 165: signed a binding agreement that mad
- Page 166 and 167: let the reactor operate until 2026.
- Page 168 and 169: time of ordering, the reactors were
- Page 170 and 171: intergovernmental agreement to comp
- Page 172 and 173: Takahama‐1 (PWR) 826 1974 - 40 10
- Page 174 and 175: IAEA have chosen to limit the LTS c
- Page 176 and 177: Note: SFP: Spent Fuel Pool, RPV: Re
- Page 178 and 179: Table 10: Definition of Credit Rati
- Page 180 and 181: Monticello 3/71 3/05 11/06Palisades
- Page 182 and 183: (as of 10 June 2015) 764Table 12: C
- Page 184 and 185: 2. Chinese Nuclear Power Plants Und
- Page 186 and 187: 2006-08, he carried out research at
- Page 188 and 189: CGN or CGNPC - Chinese General Nucl
- Page 190 and 191: INS - Indian Nuclear SocietyINSAC -
- Page 192 and 193: NSSC - Nuclear Safety and Security
- Page 194 and 195: UNSCEAR - United Nations Scientific
- Page 198 and 199: Shandong Shidaowan 200 01/12/12 2/2
- Page 200 and 201: USA 5 5 633Virgil C. Summer‐2 111
- Page 202: 25 Delayed numerous times. Latest I