Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />

6 IMPLEMENTATION OF PROJECTS AND PROGRAMS<br />

A list of projects and programs was developed to implement the proposed<br />

improvements at Honuÿapo <strong>Park</strong>. Due to the resource constraints of DPR and<br />

KOOH, the implementation of these projects and programs has been divided into<br />

four phases over a period of 25 years. The projects and programs are summarized<br />

by implementation phase in Table 6-1 below with budgetary cost estimate, park<br />

area and lead entity. The projects and programs are further described in the<br />

following sections with brief project scopes, budgetary implementation cost<br />

estimates, and potential long-term management issues and considerations.<br />

Required permits for project implementation are listed in Appendix D.<br />

The total order of magnitude cost estimate for implementation of all Honuÿapo <strong>Park</strong><br />

projects and programs in 2010 dollars is $2,400,000. Cost estimates are<br />

preliminary and for budgetary purposes only. More detailed cost estimates will be<br />

developed as part of design work for the proposed projects.<br />

Phasing <strong>Park</strong> Area Project<br />

I<br />

II<br />

Estuary<br />

Zone<br />

WP<br />

Table 6-1: <strong>Plan</strong> Implementation Summary<br />

Page 47<br />

Preliminary<br />

cost estimate<br />

Project<br />

lead<br />

Long-term<br />

Mgmt Lead<br />

Wetland Study and Restoration <strong>Plan</strong> $60,000 KOOH KOOH<br />

New park access from Mill Ditch Road<br />

(low-impact pavement), and removal of<br />

existing park access road<br />

$310,000 DPR DPR<br />

WP New BBQ pits at Whittington Beach <strong>Park</strong> $15,000 KOOH DPR<br />

Shoreline<br />

Zone<br />

NCP<br />

NCP<br />

NCP<br />

NCP<br />

NCP<br />

Makai Watch Program allow $5,000 KOOH KOOH<br />

Clearing and surface grading at <strong>Park</strong><br />

(plateau for pavilion and parking)<br />

Access road with low-impact pavement to<br />

community park and campsites<br />

<strong>Park</strong>ing areas at park and campsites, paved<br />

with low-impact pavement<br />

Native <strong>Plan</strong>t Restoration at <strong>Park</strong>, and along<br />

shoreline<br />

<strong>Park</strong> regulatory signage (Honuÿapo and<br />

Whittington parks)<br />

$350,000 DPR DPR<br />

$230,000 DPR DPR<br />

$60,000 DPR DPR<br />

$130,000<br />

DPR /<br />

KOOH<br />

DPR /<br />

KOOH<br />

$5,000 DPR DPR<br />

<strong>Park</strong> Mgmt <strong>Park</strong> management warehouse and parking $300,000 DPR DPR<br />

Estuary<br />

Zone<br />

Shoreline<br />

Zone<br />

WP: Whittington <strong>Park</strong> Area<br />

NCP: New Coastal <strong>Park</strong> Area<br />

Implementation of Wetland Restoration<br />

<strong>Plan</strong><br />

N/A KOOH KOOH<br />

Ala Kahakai Trail Segment allow $10,000 KOOH KOOH