Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />

H. Drought-tolerant Native <strong>Plan</strong>t Restoration at <strong>Park</strong> and along Shoreline<br />

Project Description: Phased planting and propagation of native coastal<br />

strand and drought tolerant ground covers, shrubs, and trees for landscaping<br />

of the park and camping areas, as well as preservation/restoration of native<br />

shoreline habitats. The existing vegetation in inland disturbed areas of<br />

Honuÿapo <strong>Park</strong> is dominated by guinea grass and is especially prone to<br />

wildfires. Native plant restoration and preservation at the park, camping<br />

areas, and along hiking trails will be an important measure to lessen the<br />

threat of wildfires.<br />

Preliminary Implementation Cost Estimate: $130,000<br />

Long-term <strong>Management</strong> Considerations: Maintenance of native coastal<br />

vegetation at the park will require regular weeding that can be<br />

accomplished by DPR maintenance crews in park areas but may need to be<br />

supplemented by volunteer help along hiking trails. Careful consideration of<br />

maintenance requirements of various plant species will be important to<br />

lessen the maintenance burden, particularly in more remote locations.<br />

I. <strong>Park</strong> Regulatory Signage<br />

Project Description: Install safety and regulatory signage at the parking lots<br />

of Honuÿapo <strong>Park</strong>. Signage will be consolidated into one large sign at each<br />

parking lot to conform with DPR’s signage at other County parks.<br />

Preliminary Implementation Cost Estimate: $5,000<br />

J. <strong>Park</strong> <strong>Management</strong> Warehouse and <strong>Park</strong>ing<br />

Project Description: Construct a 1,000-square-foot park maintenance<br />

warehouse and office building for DPR maintenance and KOOH staff use,<br />

with a fenced parking area adjacent to the warehouse.<br />

Preliminary Implementation Cost Estimate: $300,000<br />

K. Implementation of the Wetlands Restoration <strong>Plan</strong><br />

Project Description: Implement recommended projects of the Wetlands<br />

Restoration <strong>Plan</strong> (Project A), which may include but not be limited to<br />

removal of invasive exotic plants and native plant restoration, predator<br />

eradication and exclusion (“excluder fence”), Makai Watch program, etc.<br />

Preliminary Implementation Cost Estimate: will be detailed in the Wetlands<br />

Restoration <strong>Plan</strong>.<br />

Long-term <strong>Management</strong> Considerations: the Wetlands Restoration <strong>Plan</strong><br />

should take into account that KOOH will be responsible for the long-term<br />

management of estuary restoration activities. KOOH should not only<br />

Page 51