Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />

B. New Honuÿapo <strong>Park</strong> access from Mill Ditch Road and Removal of Existing<br />

<strong>Park</strong> Entrance.<br />

Project Description: Clear, grub, grade, and construct a paved 20-foot-wide<br />

by 900 feet long road access to the Whittington and new coastal park<br />

sections of Honuÿapo <strong>Park</strong> using low-impact paving materials such as<br />

porous asphalt. Porous asphalt is similar to conventional asphalt except that<br />

its mix has a lower concentration of fine material, thus allowing water to<br />

drain through. A recharge bed consisting of uniformly-graded stone mix<br />

must be placed beneath the asphalt to serve as storm water storage and<br />

filtration. Design and construction of porous pavement is more elaborate<br />

than conventional pavement; consequently, installation cost of porous<br />

asphalt may be approximately 10 to 15% higher than conventional asphalt.<br />

However, porous asphalt can provide cost savings by not requiring storm<br />

water drains.<br />

No road lighting provided. Demolish existing paved entrance to Whittington<br />

<strong>Park</strong>.<br />

Preliminary Implementation Cost Estimate: $310,000<br />

Long-term <strong>Management</strong> Considerations: Porous asphalt is generally as<br />

durable as conventional asphalt; however, its drainage effectiveness can be<br />

affected by clogging from fine particles. It is generally recommended that<br />

the pavement surface be vacuum-swept annually to maintain drainage<br />

effectiveness.<br />

C. New BBQ pits at Whittington <strong>Park</strong> Section<br />

Project Description: Construct BBQ pits near campsites and picnic tables at<br />

Whittington park section.<br />

Preliminary Implementation Cost Estimate: $15,000<br />

D. Makai Watch Program<br />

Project Description: Work with the Hawaiÿi branch of DOCARE to establish<br />

a Makai Watch program that could be tailored to KOOH’s goals and<br />

objectives. As part of the Makai Watch program, KOOH could monitor<br />

human use, increase awareness, enforce fishing regulations, and monitor the<br />

biological condition of the shoreline zone.<br />

Preliminary Implementation Cost Estimate: $5,000 for supplies assuming<br />

labor is on a volunteer basis.<br />

Long-term <strong>Management</strong> Considerations: If monitoring indicates that the<br />

marine resources around Honuÿapo would benefit from additional<br />

protection measures, the coastal zone and Honuÿapo Estuary could be<br />

recommended for designation as a Marine Managed Area. The designation<br />

Page 49