Honu'apo Park Resource Management Plan
Honu'apo Park Resource Management Plan
Honu'apo Park Resource Management Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Phasing <strong>Park</strong> Area Project<br />
III<br />
IV<br />
NCP<br />
Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />
Table 6-1: <strong>Plan</strong> Implementation Summary (continued)<br />
<strong>Park</strong> facilities: pavilion, picnic tables,<br />
campsites, BBQ pits, trails, ADA access<br />
Page 48<br />
Preliminary<br />
cost estimate<br />
Project<br />
lead<br />
$270,000 DPR<br />
Long-term<br />
Mgmt Lead<br />
DPR / KOOH<br />
(campsites)<br />
NCP Composting or vault toilet $130,000 DPR DPR<br />
WP <strong>Park</strong> interpretive displays $20,000 KOOH KOOH<br />
NCP <strong>Park</strong> interpretive displays $20,000 KOOH KOOH<br />
NCP Discovery Garden plantings and displays allow $20,000 KOOH KOOH<br />
WP<br />
WP<br />
WP<br />
WP<br />
Educational<br />
on- Programs<br />
going Educational<br />
Programs<br />
WP: Whittington <strong>Park</strong> Area<br />
NCP: New Coastal <strong>Park</strong> Area<br />
Implementation Phasing:<br />
New paved parking area in southern<br />
portion of park<br />
Demolish existing small pavilions and<br />
replace with new larger open pavilion<br />
with ADA access<br />
Demolish existing toilets on septic<br />
system and replace with composting<br />
toilet (or vault)<br />
Removal of several concrete foundations<br />
and structures at Whittington Beach <strong>Park</strong><br />
Cultural education programs<br />
Natural/environmental/ocean education<br />
programs and activities<br />
$80,000 DPR DPR<br />
$170,000 DPR DPR<br />
$140,000 DPR DPR<br />
$70,000 DPR N/A<br />
$10,000<br />
annual<br />
$10,000<br />
annual<br />
I - 1-4 years : Cost to DPR: $310,000 Cost to KOOH: $80,000<br />
KOOH KOOH<br />
KOOH KOOH<br />
II – 5-9 years: Cost to DPR: $1,080,000 Cost to KOOH: wetlands restoration cost N/A<br />
III – 10-14 years: Cost to DPR: $400,000 Cost to KOOH: $60,000<br />
IV - 15-25 years: Cost to DPR: $460,000 Cost to KOOH: $0<br />
6.1 Phase I Projects<br />
A. Wetlands Study and Restoration <strong>Plan</strong><br />
Project Description: Conduct appropriate wetlands studies, including a<br />
hydrologic study, topographic survey, and botanical survey. Based on the<br />
results of these studies, develop a Wetlands Restoration <strong>Plan</strong> that will detail<br />
restoration goals and objectives, recommended projects, and an<br />
implementation plan with alternative strategies to preserve and restore the<br />
native ecosystem of the Honuÿapo Estuary. The Wetlands Restoration <strong>Plan</strong><br />
should take into account the kuleana parcels around the estuary, which are<br />
excluded from the park property, and thus should not be included in key<br />
habitat restoration areas.<br />
Preliminary <strong>Plan</strong>ning Cost Estimate: $60,000