Phasing <strong>Park</strong> Area Project<br />

III<br />

IV<br />

NCP<br />

Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />

Table 6-1: <strong>Plan</strong> Implementation Summary (continued)<br />

<strong>Park</strong> facilities: pavilion, picnic tables,<br />

campsites, BBQ pits, trails, ADA access<br />

Page 48<br />

Preliminary<br />

cost estimate<br />

Project<br />

lead<br />

$270,000 DPR<br />

Long-term<br />

Mgmt Lead<br />

DPR / KOOH<br />

(campsites)<br />

NCP Composting or vault toilet $130,000 DPR DPR<br />

WP <strong>Park</strong> interpretive displays $20,000 KOOH KOOH<br />

NCP <strong>Park</strong> interpretive displays $20,000 KOOH KOOH<br />

NCP Discovery Garden plantings and displays allow $20,000 KOOH KOOH<br />

WP<br />

WP<br />

WP<br />

WP<br />

Educational<br />

on- Programs<br />

going Educational<br />

Programs<br />

WP: Whittington <strong>Park</strong> Area<br />

NCP: New Coastal <strong>Park</strong> Area<br />

Implementation Phasing:<br />

New paved parking area in southern<br />

portion of park<br />

Demolish existing small pavilions and<br />

replace with new larger open pavilion<br />

with ADA access<br />

Demolish existing toilets on septic<br />

system and replace with composting<br />

toilet (or vault)<br />

Removal of several concrete foundations<br />

and structures at Whittington Beach <strong>Park</strong><br />

Cultural education programs<br />

Natural/environmental/ocean education<br />

programs and activities<br />

$80,000 DPR DPR<br />

$170,000 DPR DPR<br />

$140,000 DPR DPR<br />

$70,000 DPR N/A<br />

$10,000<br />

annual<br />

$10,000<br />

annual<br />

I - 1-4 years : Cost to DPR: $310,000 Cost to KOOH: $80,000<br />

KOOH KOOH<br />

KOOH KOOH<br />

II – 5-9 years: Cost to DPR: $1,080,000 Cost to KOOH: wetlands restoration cost N/A<br />

III – 10-14 years: Cost to DPR: $400,000 Cost to KOOH: $60,000<br />

IV - 15-25 years: Cost to DPR: $460,000 Cost to KOOH: $0<br />

6.1 Phase I Projects<br />

A. Wetlands Study and Restoration <strong>Plan</strong><br />

Project Description: Conduct appropriate wetlands studies, including a<br />

hydrologic study, topographic survey, and botanical survey. Based on the<br />

results of these studies, develop a Wetlands Restoration <strong>Plan</strong> that will detail<br />

restoration goals and objectives, recommended projects, and an<br />

implementation plan with alternative strategies to preserve and restore the<br />

native ecosystem of the Honuÿapo Estuary. The Wetlands Restoration <strong>Plan</strong><br />

should take into account the kuleana parcels around the estuary, which are<br />

excluded from the park property, and thus should not be included in key<br />

habitat restoration areas.<br />

Preliminary <strong>Plan</strong>ning Cost Estimate: $60,000