6.4 Phase IV Projects<br />

Q. Paved <strong>Park</strong>ing Area at Whittington <strong>Park</strong> Section<br />

Honuÿapo <strong>Park</strong> Final <strong>Resource</strong>s <strong>Management</strong> <strong>Plan</strong><br />

Project Description: Grade and pave one parking area (currently unpaved) at<br />

Whittington park section using low-impact pervious paving such as porous<br />

asphalt. Provide parking area lighting designed to minimize impact on<br />

nocturnal birds and marine fauna.<br />

Preliminary Implementation Cost Estimate: $80,000<br />

Long-term <strong>Management</strong> Considerations: As with roads paved with porous<br />

asphalt, parking areas should be vacuum-swept annually to maintain<br />

drainage effectiveness.<br />

R. Replacement of Existing Small Pavilions with One Larger Open Pavilion at<br />

Whittington <strong>Park</strong> Section<br />

Project Description: Demolish three old enclosed concrete pavilions and<br />

construct a large open multi-use pavilion in their place. Provide water for<br />

this pavilion using existing water lines from nearby above-ground storage<br />

tank. The pavilion should be designed so as to minimize impact on views<br />

and so as not to impede water flow in the event of coastal flooding. The<br />

pavilion will be painted to blend in with its surroundings. An ADA<br />

accessible path will be provided from the parking area to the pavilion and<br />

restroom and will be paved using permeable pavement.<br />

Preliminary Implementation Cost Estimate: $170,000<br />

S. Replacement of Existing Restrooms with Composting Toilet<br />

Project Description: Demolish existing restroom and abandon existing<br />

seepage pit in-place. Install a solar-powered composting toilet or vault toilet<br />

accommodating four users at a time and with ADA compliant access. The<br />

composting toilet will need to be constructed using breakaway walls so as<br />

not to impede the flow of flood waters in the event of coastal flooding.<br />

Preliminary Implementation Cost Estimate: $140,000<br />

Long-term <strong>Management</strong> Considerations: see Project N – Composting toilet at<br />

New Coastal <strong>Park</strong> Section.<br />

Page 54