29.08.2015 Views

Pre Bid response for supply of Laptops for ... - DOITC Rajasthan

Pre Bid response for supply of Laptops for ... - DOITC Rajasthan

Pre Bid response for supply of Laptops for ... - DOITC Rajasthan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S. No RFP<br />

Page<br />

No.<br />

92<br />

43<br />

RFP Rule<br />

no.<br />

Title and<br />

Risk<br />

Transfer<br />

Rule details Query/Suggestion/clarification Response<br />

All title <strong>of</strong> the assets to be<br />

transferred to Department <strong>of</strong><br />

Education or RISL or its<br />

nominated agencies pursuant to<br />

clause(s) above shall be transferred<br />

on the last day <strong>of</strong><br />

the exit management period<br />

Vendor assumes that the title <strong>of</strong> ownership <strong>of</strong> the goods supplied under this<br />

contract is passed on the customer on delivering the material to the<br />

customer. Request your confirmation on this. Without this, revenue will not<br />

get recognized.<br />

As per amended RFP<br />

93<br />

43<br />

Exit<br />

Managem<br />

ent<br />

Refer RFP<br />

Vendor should not bear any cost or penalty or charge w.r.t Exit management.<br />

Buyer should bear all cost and charges. Also as per the clause number 37 B<br />

(iii) B page number 43, assets will get transferred after 3 years, which means<br />

the revenue will not get recognized <strong>for</strong> bidder <strong>for</strong> 3 years. Request you to<br />

kindly delete this clause. This is very important clause <strong>for</strong> deletion. Request<br />

you to kindly delete.<br />

As per amended RFP<br />

94<br />

48<br />

Laptop<br />

Processor<br />

Latest generation X86, Dual Core<br />

(Intel Pentium/AMD Processor with<br />

processor Speed <strong>of</strong> 2.0 GHZ or<br />

higher with 2MB cache)<br />

Request you to kindly remove Pentium as a sub brand from the processor<br />

required from Intel, as the per<strong>for</strong>mance is being bench marked by the<br />

SYSmark rating mentioned in the tender document. Hence pls change the<br />

processor to "X86 dual core architecture " to avoid any confusion in plat<strong>for</strong>m<br />

available."<br />

As per RFP<br />

95<br />

Bill <strong>of</strong><br />

Material<br />

We request department to please clarify what is meant the Period <strong>of</strong> end <strong>of</strong><br />

Service as it is mentioned to be 24 months where as the warranty is 12<br />

months<br />

End <strong>of</strong> service is the period <strong>for</strong> which<br />

the OEM supports the product in<br />

terms <strong>of</strong> repair, spare parts etc.<br />

47<br />

Warranty shall be provided by the<br />

bidder <strong>for</strong> 1 year however OEM shall<br />

support the product <strong>for</strong> next 24<br />

months<br />

96<br />

49<br />

Technical<br />

Specificati<br />

on<br />

Optical Drive<br />

Please change the speed <strong>of</strong> the DVRW to 8x as that is the speed that we get in<br />

case <strong>of</strong> Slim DVDRW which are used in notebooks<br />

As per amended RFP<br />

97<br />

49<br />

Technical<br />

Specificati<br />

on<br />

AC Power Adapter<br />

Request you to change the same to 110-240V as that is the industry standard,<br />

however the same would be tested to operate within the given range <strong>of</strong> 110-<br />

250V<br />

As per RFP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!