S. No RFP<br />
Page<br />
No.<br />
RFP Rule<br />
no.<br />
Rule details Query/Suggestion/clarification Response<br />
130 24 30 * At the time the Contract is<br />
awarded, the quantity <strong>of</strong> Goods and<br />
Related Services originally specified<br />
in the bidding document may be<br />
increased or decreased but without<br />
any change in the unit prices or<br />
other terms and conditions <strong>of</strong> the<br />
bid and the bidding document.<br />
* If the work order is placed up to<br />
100% in excess <strong>of</strong> the quantities<br />
mentioned in the bidding<br />
document, the bidder shall be<br />
bound to meet the required <strong>supply</strong>.<br />
* If the tendering authority does<br />
not purchase any <strong>of</strong> the tendered<br />
articles or purchases less than the<br />
quantity indicated in the bidding<br />
document, the bidder shall not be<br />
entitled to claim any compensation.<br />
1) HP proposes to limit any quantity variation to 15% to 20%, <strong>of</strong> the quantity<br />
specified in RFP. Any increase <strong>of</strong> decrease greater than 15% to 20%, will need<br />
to be discussed and agreed with vendor.<br />
As per RFP