21.09.2015 Views

PLANNING & URBAN DESIGN RATIONALE

77-79 EDR Planning Rationale

77-79 EDR Planning Rationale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

it will provide for the adaptive re-use of an existing building located within the Lower<br />

Don Special Policy Area. It also represents an innovative approach to urbanizing<br />

what has traditionally been a “suburban”, space-extensive land use by sharing<br />

facilities among 5 dealerships, locating all service and car storage functions either<br />

internal to the building or underground and achieving a high level of design.<br />

With respect to the matter of conformity with applicable Special Policy Area policies<br />

in the City of Toronto Part I Official Plan, the proposed arrangement of land uses<br />

will result in the re-use of the existing warehouse building located partially within<br />

the Special Policy Area for non-residential (automotive and ancillary office) uses.<br />

Similarly, the westerly portion of the North Building, located within the Special<br />

Policy Area, is proposed for non-residential automotive uses. The residential uses<br />

in the South Building will be located either on top of and to the east of the retained<br />

portion of the existing warehouse building and, accordingly, would be located<br />

above the flood elevation. Safe access and egress to residential uses will be<br />

provided via the proposed site access from Queen Street.<br />

5.3 Avenue Segment Study<br />

As set out in Section 4.3 of this report, the northerly portion of the subject site<br />

fronting on Queen Street is located within an Avenue for which an Avenue Study<br />

has not been completed. The Official Plan permits development to proceed on an<br />

Avenue prior to an Avenue Study, provided that development proponents address<br />

the larger context and examine the implications for the segment of the Avenue in<br />

which the proposed development is located.<br />

In our opinion, while the limits of the Avenues are not dimensioned on Map 2 of the<br />

Official Plan, the Avenues identification is intended to apply to the portion of the<br />

site having a direct relationship to the Queen Street frontage. The lands related to<br />

the Queen Street frontage are essentially coincident with the lands currently zoned<br />

MCR T2.5 R2.0 C2.0, while the rear (southerly) portion of the lands currently zoned<br />

I2 D3 would fall outside the limit of the Avenues.<br />

In accordance with Policy 2.2.3(3) of the Official Plan, an Avenue Segment Study<br />

was undertaken by The Planning Partnership (May 2014). The study is an update<br />

of a February 2007 version of the study prepared by The Planning Partnership in<br />

support of the rezoning applications for 625 Queen Street East and 630 Queen<br />

Street East.<br />

The Avenue Segment Study concludes as follows:<br />

“The focus of this evaluation has been primarily upon how<br />

the portion of the proposed mixed use development at 677<br />

Queen Street East and 77-79 East Don Roadway that fronts onto<br />

the Queen Street corridor achieves the Guiding Principles<br />

and conforms to the requirements set out in the Planning<br />

Framework. Based upon the evaluation of this component<br />

of the proposed mixed use developments, the proposed<br />

<strong>PLANNING</strong> & <strong>URBAN</strong> <strong>DESIGN</strong> <strong>RATIONALE</strong> | 79 East Don Roadway & 677 Queen Street East 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!