10.05.2016 Views

Building Design Construction

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

products<br />

AT WORK<br />

BY DAVID MALONE, ASSOCIATE EDITOR<br />

BATHROOM PARTITIONS CARRY MODERN DESIGN<br />

OF RESTAURANT BEYOND THE DINING ROOM<br />

Hiny Hiders might not be the subtlest of names for a bathroom partition, but the highdensity<br />

polyethylene partitions from Scranton Products do accomplish exactly what<br />

their name suggests, and much more. The Blu Wasabi restaurant in Clarks Summit, Pa.,<br />

selected Hiny Hiders for its bathrooms to enhance the modern styling of the restaurant<br />

without sacrifi cing functionality. Hiny Hiders never need painting and are resistant to<br />

dents, scratches, corrosion, mildew, and moisture, according to the maker. Another<br />

benefi t: they are resistant to pencil, pen, paint, stickers, and most markers. Easy to clean<br />

and naturally resistant to bacteria, Hiny Hiders partitions come with a 25-year warranty.<br />

Available in a variety of colors, textures, and fi re rating options.<br />

Scranton Products<br />

CIRCLE NO. 811 ON READER SERVICE CARD<br />

ADJUSTABLE SKYLIGHT SYSTEM CAN ILLUMINATE<br />

MULTIPLE FUNCTIONS AT CALIFORNIA HIGH SCHOOL<br />

San Benito High School, Hollister, Calif., uses its gym not just for sporting<br />

events, but also for daily lunch periods and school assemblies. This means<br />

the amount of light required changes depending on what activity the gym is<br />

hosting at a given moment. For that reason, when it came time to replace the<br />

40x40-foot skylight in the center of the gym’s ceiling, the decision was made<br />

to use the IntelaSun skylight from CPI Daylighting. What makes this skylight<br />

unique is its dynamic shading system, which adjusts based on the angle of<br />

the sun and user-controlled settings. The system can either be fully automated<br />

or controlled manually from a wall-mounted panel. When completely<br />

open, light transmission in the gym reaches 66%; when the SolaBlades are<br />

closed, light transmission drops to 3%. This means the gym can be used for<br />

a variety of functions, regardless of the time of the day.<br />

CPI Daylighting<br />

CIRCLE NO. 812 ON READER SERVICE CARD<br />

STARBUCKS SPECIFIES HIGH-PERFORMANCE FLOOR<br />

TO KEEP UP WITH HEAVY FOOT TRAFFIC<br />

Think about how many people pass through your local Starbucks coffee house<br />

on a daily basis. Now imagine a Starbucks in the Mong Kok district of Hong<br />

Kong, one of the most densely populated places in the world, at 130,000<br />

people per square kilometer. To ensure that its fl oors would maintain a clean,<br />

attractive, unblemished look, the retailer specifi ed a semi-dry cementitious<br />

screed, called Isocrete K-Screed, and a seamless epoxy resin terrazzo system,<br />

Mondéco Earth, from Flowcrete. Isocrete K-Screed provides a strong, level, and<br />

reliable platform that allows for the application of a Mondéco Earth fi nish. An<br />

almond-colored fi nish was used to achieve the performance necessary and to<br />

complement the urban aesthetic that is central to the Starbucks brand.<br />

Flowcrete<br />

CIRCLE NO. 813 ON READER SERVICE CARD<br />

82 MAY 2016 BUILDING DESIGN+CONSTRUCTION www.BDCnetwork.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!