14.06.2016 Views

Conference Report 2016

Table of contents contains links on page 5. It can be used to skip through chapters.

Table of contents contains links on page 5. It can be used to skip through chapters.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CENTRAL EXECUTIVE COMMITTEE REPORT<br />

hEAlTh AND SAfETy<br />

SAfETy, hEAlTh AND wElfARE AT wORK ACT<br />

2005 – SElECTION Of SAfETy<br />

REPRESENTATIVES<br />

The Committee noted that the requirements under<br />

Section 25(1) of the Safety, Health and Welfare at Work<br />

Act 2005 were not being complied with in that the<br />

establishment of the process to select Safety<br />

Representatives for the period 2015 -2018 had not<br />

commenced. On several occasions throughout 2015, the<br />

Garda Representative Association sought compliance<br />

with this statutory requirement. The committee also<br />

noted that the selection process rollout and numbers of<br />

Safety representatives should not be limited.<br />

It was noted by the Committee that this statutory<br />

provision states:<br />

“Employees may, from time to time, select and appoint<br />

from amongst their number at their place of work a<br />

representative (in this Act referred to as a “Safety<br />

representative”) or, by agreement with their employer,<br />

more than one safety representative, to represent them<br />

at the place of work in consultation with their employer<br />

on matters related to safety, health and welfare at the<br />

place of work”<br />

The committee believed that this statutory obligation has<br />

the potential to empower employees within An Garda<br />

Síochána with ownership of the health and safety<br />

processes and compliance.<br />

TETRA AND TElECOmmuNICATIONS mASTS<br />

The Committee discussed Tetra Radio and Mobile phone<br />

masts. The committee noted that AGSI had referred to<br />

same at their Annual Delegate <strong>Conference</strong> 2015. The<br />

committee have sought answers to the following<br />

questions and answers are awaited:<br />

(i) Is there a list of all Garda controlled stations/<br />

facilities where there is a telecoms mast in<br />

existence?<br />

(ii) Who is using the masts in each of the locations?<br />

(iii) Has research been conducted on the level of<br />

radiation at each location?<br />

The Sub Committee reported to the Central Executive<br />

Committee and is currently evaluating the costings of the<br />

Garda Representative Association conducting an<br />

electromagnetic radiation study at nominated stations.<br />

The results of any monitoring studies being conducted<br />

by either the OPW or Garda Management are also<br />

awaited for evaluation.<br />

mOTORwAy INCIDENT PROTOCOlS<br />

The committee queried current Garda Organisational<br />

policy regarding dealing with incidents on Motorways.<br />

Members of the committee stated that they were<br />

0<br />

Garda Representative Association

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!