12.12.2012 Views

Installation, Owner, and Diagnostic Manual IntelliPak® - Trane

Installation, Owner, and Diagnostic Manual IntelliPak® - Trane

Installation, Owner, and Diagnostic Manual IntelliPak® - Trane

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rigging <strong>and</strong> Unit H<strong>and</strong>ling<br />

Before lifting the unit or modular<br />

component, determine the approximate<br />

center of gravity for lifting safety. See<br />

Figure I-PC-5 for assembled modular<br />

units <strong>and</strong> Figure I -PC-6 for split-apart<br />

units. The center of gravity may vary<br />

slightly within the gravity block<br />

depending on unit options.<br />

!<br />

WARNING<br />

Ensure lifting equipment capacity<br />

exceeds unit weight by an<br />

adequate safety factor to prevent<br />

injury, death, or unit damage.<br />

Always test-lift the unit to determine the<br />

exact unit balance <strong>and</strong> stability before<br />

hoisting it to the installation location. See<br />

Figures I-PC-7 <strong>and</strong> I-PC-8 for typical<br />

rigging procedures <strong>and</strong> proper rigging<br />

equipment usage.<br />

����� WARNING<br />

!<br />

To prevent injury or death <strong>and</strong><br />

unit damage, always test-lift the<br />

unit to determine actual center of<br />

gravity. See Figures I-PC-5 <strong>and</strong> I-<br />

PC-6.<br />

<strong>Installation</strong><br />

Figure I-PC-5. Assembled unit gravity block location.<br />

Table I-PC-2. Gravity Block Dimensions<br />

Model A B C D<br />

SXWG 36 14 38 12<br />

SXRG 36 16 40 12<br />

Fan Section Only<br />

Compressor Section Only<br />

Figure I-PC-6. Split-apart unit gravity block location.<br />

Pre-<strong>Installation</strong><br />

Considerations<br />

12 SCXG-SVX01B-EN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!