Southside D12
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ONE PARK WEST, LIVERPOOL<br />
A GLASS FAÇADE MODERN MIXED USE SCHEME,<br />
PART OF THE LIVERPOOL ONE DEVELOPMENT<br />
THE CHALLENGES<br />
• Rough sleepers and Anti social behaviour (ASB) from<br />
the local open space<br />
• Plant and equipment that needs to be sourced from<br />
outside the UK<br />
• Airbnb or other short term subletting<br />
• Commercial unit noise that disturbs residents<br />
• Controlling temperature and cooking smells in<br />
communal spaces<br />
• Cradle maintenance<br />
• Communal water heating and maintenance<br />
OUR APPROACH<br />
• Development of an entry system strategy including<br />
access and CCTV monitored on-site<br />
• Critical part ordering and storage to mitigate the risk<br />
long delivery periods<br />
• Working with commercial tenants, particularly the<br />
gym to retrofit suitable soundproofing to reduce noise<br />
pollution<br />
• Training for on-site concierge to remove the problems<br />
associated with Airbnb and specialist security<br />
protocols<br />
<br />
• Retrofit/adaptation of smoke vents to control airflow,<br />
corridor temperature and cooking smells<br />
• Introduction of alarm systems to notify the property<br />
management team of faults, allowing a four hour<br />
window before loss of hot water to the building