METHODOLOGY<br />

The testing project began with the removal of bricks, mortar and plaster samples on 14<br />

November 2014. One brick sample was taken from each of the two chimneys (Room<br />

105 and Room 207), one brick sample was taken from the each of the two areas that<br />

had that material as wall nogging (Room 105 and Room 107); one chimney mortar<br />

sample (Room 105) and one wall nogging mortar sample (Room 105); and twelve<br />

plaster samples from various spots throughout the house.<br />

RILEM Test 11. 4 One brick from near the top of the chimney at the north gable end<br />

of Room 207 and one nogging brick from inside the east wall of Room 107 were<br />

selected and removed. The RILEM tube was affixed to each brick in turn, sealed with<br />

putty, and filled with water. At intervals up to one hour, data was collected reflecting<br />

the absorption of water through capillary pathways in the brick.<br />

Experiment 10: Penetration of Water One chimney brick from above the mantle in<br />

Room 105 and one nogging brick from inside the wall in Room 105 were selected and<br />

removed. Both bricks were placed on end in a pan of water and over the course of<br />

three hours the rate of vertical absorption was recorded.<br />

Mortar Analysis Samples of mortar were collected from the chimney of Room 105, and<br />

from the between the wall nogging bricks of Room 105. The samples were tested<br />

using the wet-chemical method: Each sample was crushed with a mortar and pestle and<br />

digested in white vinegar and water. The samples were allowed to digest for 12 hours,<br />

after which they were filtered using a funnel and paper filter. The fines and sand that<br />

remained in the filter paper were dried on cookie sheets over the hot air vent in my<br />

guest room for 24 hours. Samples were then sieved and weighed; proportions of<br />

aggregate size were recorded and graphed.<br />

Plaster Analysis Samples of plaster were collected from Rooms 102, 103, 105, 107,<br />

201, 202, 203, 207. The samples were also tested using the wet-chemical method.