14.06.2017 Views

William Pitcher Farmstead HSR

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ATTIC: MAIN HOUSE<br />

The attic of the main house is accessed by climbing up the main house roof sheathing<br />

in the garret of the ell (206) and climbing through a small opening (photo attic-1). The<br />

sheathing boards visible from the garret are tightly spaced and do not have nail holes,<br />

which would have been present if this area was ever covered with shingles. The roof<br />

structure appears to be consistent throughout the main section of the house, implying<br />

that it was put on AFTER the addition to the east end, and at the same time that the<br />

ell was attached. The rafters, as in the garret, are slightly tapered to a bridle or lap<br />

joint (photo attic-2). The collar ties are attached to the rafters with lapped half-dovetail<br />

joints (photo attic-3). The ends of the rafters are nailed to the top plates. The western<br />

end of the attic, above Room 201, has planks laid over the collar ties, perhaps to allow<br />

for more storage early on. The rest of the attic, above the center hall area, the dormer<br />

room, and Room 204 has lath attached to the bottom of the collar ties and plaster<br />

keys visible beneath.<br />

94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!