Powers Buyers Guide
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SC-PRO ®<br />
VINYLESTER GLASS SPINNING CAPSULE ADHESIVE ANCHORING SYSTEM<br />
The SC-PRO anchor system consists of integrated two-component glass<br />
capsules and matching chisel pointed anchor rods which are installed using<br />
a rotary hammer. An outer capsule contains epoxy acrylate resin (vinyl-ester)<br />
in which quartz aggregate is suspended. The inner capsule contains<br />
a hardening agent. SC-PRO capsules are the best solution for simple, no<br />
fuss, fast setting at standard embedment depths with controlled wastage.<br />
During installation, the SC-PRO system<br />
bonds the threaded rod to the base<br />
material so no expansion forces are<br />
exerted against the walls of the hole<br />
Curing Times<br />
Base Material<br />
Temp (°C)<br />
Minimum Curing<br />
Time<br />
in the base material. Unlike expansion<br />
anchors, the anchor can be set close<br />
to the edge of concrete.<br />
- 5°C + 5°C + 20°C + 30°C<br />
5hrs 60min 20min 10min<br />
Curing time is for dry concrete. Curing time must be doubled for wet concrete.<br />
Approvals & Reports<br />
The following ETA assessment reports can be used to<br />
design anchors in accordance with SA TS 101:2015<br />
which is referenced in the National Construction<br />
Code (NCC) 2016:<br />
ETA-11/0473 ETAG 001-5 Option 7<br />
Threaded rod, uncracked concrete<br />
(M8-M30)<br />
ADHESIVE ANCHORS<br />
Applications<br />
Hand rails, gates, steel posts, wall ties, structural connections.<br />
Size Capsule Ø Min.<br />
Embed<br />
Max.<br />
Fixture<br />
Drilled<br />
Hole Ø<br />
M8 9 80 15 10 10 SC-PROM8-PWR<br />
M10 11 90 21 12 10 SC-PROM10-PWR<br />
M12 13 110 27 14 10 SC-PROM12-PWR<br />
M16 17 125 40 18 10 SC-PROM16-PWR<br />
M20 17 170 60 22 10 SC-PROM20-PWR<br />
M24 22 210 56 26 6 SC-PROM24-PWR<br />
Box<br />
Qty<br />
Part<br />
No.<br />
Installation - Hammer Drilled<br />
1 2 3 4 5 6 7<br />
8<br />
9<br />
2X<br />
2X<br />
2X<br />
20 Min<br />
e.g.<br />
20˚C<br />
Connection Load Condition Hole Condition Base Material<br />
Threaded Rod<br />
Internal<br />
Threaded<br />
Sleeve<br />
Reinforcing<br />
Bar<br />
Overhead<br />
Load<br />
Static Load<br />
Quasi-Static<br />
Load<br />
Seismic<br />
Moderate<br />
Wind<br />
High Wind<br />
Dry Hole/Wet<br />
Concrete<br />
Flooded<br />
Hole<br />
Core<br />
Drilled<br />
Concrete<br />
Cracked<br />
Concrete<br />
Stone<br />
▲<br />
Sand / Lime<br />
Stone<br />
▲<br />
Solid Brick<br />
Hollow Brick<br />
Recommended Recommended With Care Site Tests Should Be Implemented<br />
Detailed performance data is available for all <strong>Powers</strong> products<br />
www.powers.com.au<br />
91