14.12.2012 Views

Paris Nord Villepinte du 04 au 07 octobre 2012 - Espace Exposant ...

Paris Nord Villepinte du 04 au 07 octobre 2012 - Espace Exposant ...

Paris Nord Villepinte du 04 au 07 octobre 2012 - Espace Exposant ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DECORATION REGULATIONS<br />

IMPORTANT<br />

In order to avoid disputes, it is mandatory to submit the stand layout plan for approval by July 13th, <strong>2012</strong>.<br />

The stand layout plan must necessarily include the following elements:<br />

• Plan view including scale and dimensions;<br />

• Elevation view including scale, dimensions, and heights of projected volumes.<br />

Any project that will not comply with the Regulations will be rejected, and any stand that would be erected<br />

without the approval of the following architectural firm would be dismantled at the exhibitor's expense.<br />

.<br />

DECO PLUS<br />

MR Wilfrid TOUGARD<br />

1, RUE PAUL DELAROCHE<br />

75116 PARIS<br />

Tel : +33 (0)1 47 63 94 84<br />

Fax : +33 (0)1 43 80 59 63<br />

E-mail : w.decoplus@free.fr<br />

The SILMO Architectural Regulations cover the stand fitting-out and construction rules which have<br />

been set out to guarantee the proper operation of the exhibition as well as optimum visit comfort.<br />

No agreement made between exhibitors will be <strong>au</strong>thorized; only the Organizer or DECO PLUS are<br />

entitled to grant dispensation upon submission of a written request.<br />

1- HALL FLOOR, PILLARS AND WALLS<br />

It is strictly forbidden to drill, screw, nail or embed the walls, cladding panels, pillars and floors of the halls, in<br />

particular to anchor exhibited machines.<br />

A fixed price of € 300 excl. VAT per hole will be charged to the exhibitor in case of non compliance with these<br />

instructions. Furthermore, it is forbidden to paint or mark the walls, pillars and floor of the halls.<br />

Allowed floor loading: 35 tonnes or 13 tonnes per axle.<br />

Overload: 5 tonnes / sqm.<br />

Resistance to puncture: 6.5 tonnes maxi per 10 sqcm.<br />

Your space must be restored to its original condition. An outgoing inventory of fixtures will be requested; it will<br />

be issued by the exhibition's technical support office on completion of the stand dismantling.<br />

All waste materials (e.g. carpeting, adhesives) must be removed. Otherwise COMEXPOSIUM will charge<br />

you a package depending on the surface of your booth is:<br />

- Booth less than about 99sqm = 1000 €,<br />

- Booth between 100sqm and 199sqm = 2000€,<br />

- Booth from 200sqm = 3000€<br />

Any damage reported on stand dismantling will be charged to the exhibitor who is liable for the damage.<br />

The exhibitor is personally responsible for his suppliers, i.e. decorators, installers, contractors.<br />

2- STAND INSTALLATION AND DISPLAY OF EXHIBITS<br />

Exhibits on display must not disturb nor damage neighbouring stands. Equipment and machinery must not<br />

project beyond the stand boundaries.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!