01.11.2022 Views

2022 November December Marina World

The magazine for the marina industry

The magazine for the marina industry

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

New superyacht haven<br />

in Greek isles<br />

GREECE: <strong>Marina</strong> Porto Heli, a new marina located southwest of Athens in the<br />

islands of the Saronic Gulf, is now welcoming yachts up to 55m (180ft). Built<br />

within a naturally sheltered bay, it has capacity for 149 vessels.<br />

CHANNEL ISLANDS: Walcon Marine has completed a comprehensive like-for-like rebuild of St Helier <strong>Marina</strong> in Jersey.<br />

The project retains around 250 berths across seven piers for boats up to 25m (82ft) in length, and alongside visitor<br />

berthing.<br />

Walcon’s aluminium System 2000<br />

pontoons and the other two, in a<br />

more exposed location, constructed<br />

from System 21 steel docks. Walcon<br />

also supplied the walkways, finger<br />

pontoons and wall columns. Geomarine<br />

refurbished and reinstalled the two<br />

access bridges.<br />

“It was a pleasure to be working with<br />

the Ports of Jersey and local contractor<br />

Geomarine once again,” said Walcon<br />

managing director James Walters.<br />

“We have worked with Geomarine on<br />

a number of projects over the years,<br />

including the recent works at Albert<br />

Dock in St Helier, and the cooperation<br />

is always excellent.”<br />

Main contractor Geomarine<br />

undertook work between September<br />

2021 and May <strong>2022</strong>, during which<br />

the entire floating infrastructure was<br />

removed and replaced. Five of the<br />

seven new piers were built using<br />

WORLD NEWS<br />

300m (980ft) SF <strong>Marina</strong> concrete dock<br />

system.<br />

The pontoon layout consists of two<br />

arms. Both begin in the shallow areas<br />

with SF <strong>Marina</strong> type SF1240 pontoons.<br />

With a height of only 1.2m (4ft) and<br />

a freeboard of less than 0.6m (2ft),<br />

they provide ample space beneath the<br />

docks for secure mooring. After angling<br />

inwards, SF400 pontoons are used.<br />

On the east side, the arm continues<br />

with SF1260 pontoons and SF1240<br />

models used for storage. Each of the<br />

two arrays has a pair of interior docks<br />

comprising SF STD 2.4 units.<br />

The greater challenge was the<br />

extensive network of 30 utility ducts.<br />

SF <strong>Marina</strong> engineers designed large<br />

EM boxes and a unique channel at the<br />

ends of each pontoon with the ability<br />

to cross the network around the centre<br />

connectors. Currently, the ductwork<br />

system contains 16A-125A electrical,<br />

potable water and communication<br />

cables, as well as pump-out. Plans are<br />

being finalised to include fuel service.<br />

“Once our interior marine department<br />

offloaded the pontoon sections with a<br />

floating crane, they were easy to install,”<br />

said Nikolas Aslanidis, manager of the<br />

floating pontoon department at Tomi.<br />

“The marina owner is very satisfied<br />

with the results and we are already in<br />

discussion on a second nearby project<br />

at Ermioni Port.”<br />

Construction, undertaken by the near the west and east walkways and<br />

floating pontoon department at Ellaktor the extensive utility ductwork needed<br />

Group company Tomi, was challenging. to service superyachts. The depth<br />

This was primarily due to shallow water issue was easily overcome with a<br />

Jersey marina invests in rebuild<br />

St Helier <strong>Marina</strong> opened in 1981 and<br />

this £3.5 million investment is its first<br />

major refurbishment.<br />

www.marinaworld.com – <strong>November</strong>/<strong>December</strong> <strong>2022</strong> 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!