HANSA Yachts 01-2024
EDITORIAL: Is the future electric? | NEWS & EVENTS | SPOTLIGHT ON: German shipyards triumph at the »Yacht Oscars« | Mega yacht with a luxury base | Huge dock for small yacht | YACHT PROJECTS: First choice/Restart on »REV Ocean«/What‘s coming in 2024? | INTERVIEW: Derecktor Shipyard: From a small shop to a refit giant| YACHT EQUIPMENT:Voith supplies propulsion for largest A&R-yacht/New IPS Professional Platform introduced/MAN Engines strengthens partnership with Next Yacht Group| HANSA YACHTS INTRODUCES MATHIAS PEIN: »Smooth running guaranteed« | SHOWS & EVENTS 2024/25
EDITORIAL: Is the future electric? | NEWS & EVENTS | SPOTLIGHT ON: German shipyards triumph at the »Yacht Oscars« | Mega yacht with a luxury base | Huge dock for small yacht | YACHT PROJECTS: First choice/Restart on »REV Ocean«/What‘s coming in 2024? | INTERVIEW: Derecktor Shipyard:
From a small shop to a refit giant| YACHT EQUIPMENT:Voith supplies propulsion for largest A&R-yacht/New IPS Professional Platform
introduced/MAN Engines strengthens partnership with Next Yacht Group| HANSA YACHTS INTRODUCES MATHIAS PEIN: »Smooth running guaranteed« | SHOWS & EVENTS 2024/25
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
YACHT PROJECTS<br />
After a building break »REV Ocean« will leave her shipyard with a 12 metre extension. Her LOA will be nearly 195 metre<br />
acquired the 71-metre »Skat« from Charles Simonyi. A vessel in<br />
his possession for two decades, constructed by Lürssen and designed<br />
by Espen Øino – mirroring the design team of »REV<br />
Ocean«. Simonyi later replaced »Skat« with the 20-metre »Norn«,<br />
maintaining continuity with the same shipyard and designer.<br />
While construction on »REV Ocean« experienced a pause in<br />
2021, the shipyard has confirmed the preservation of the vessel‘s<br />
original vision with plans to enhance its functionality. This includes<br />
a midship extension of 12 metres, elongating the existing<br />
hull for increased buoyancy and incorporating lightweight materials<br />
to replace some of the steel. The vessel will feature a reorganized<br />
layout, providing more space and heightened scientific<br />
capacity in its primary hangar.<br />
Kjell Inge Røkke‘s vision for »REV Ocean« transcends a conventional<br />
superyacht, positioning it as a platform for knowledge<br />
acquisition. Welcoming researchers, environmental groups, and<br />
institutions on board, Røkke envisions the vessel as a hub for developing<br />
innovative solutions to address challenges and opportunities<br />
related to the seas.<br />
Despite its collaboration with leading superyacht designer<br />
Espen Øino, »REV Ocean« won‘t be classified as a traditional<br />
superyacht. Focused on advanced oceanography, the vessel will<br />
be equipped with state-of-the-art equipment to survey marine<br />
environments comprehensively. The extension will facilitate a<br />
dedicated submarine hangar, a HiPAP system for subsea equipment<br />
tracking, an additional science lab, and facilities for 3D<br />
printing and onboard metalwork. In alignment with environmental<br />
consciousness, »REV Ocean« is designed for optimal fuel<br />
efficiency, featuring an energy recovery rudder system, mediumspeed<br />
engines, a direct-drive diesel-electric propulsion system,<br />
and an exhaust cleaning system. The increase in size, though<br />
leading to a 32% rise in fuel capacity and range, is anticipated to<br />
have a relatively minor impact on fuel consumption.<br />
Upon delivery, »REV Ocean« will be available for charter, with<br />
plans for its maiden voyage involving a journey from the Arctic<br />
via the Norwegian coast, followed by a route through the United<br />
States and South America to reach the Southern Ocean.<br />
The expected delivery by VARD is set for February 2025, with<br />
operational readiness projected for Q4 2026. VARD will undertake<br />
the rebuild at its facilities in Norway, and final completion<br />
activities will occur at a location to be determined closer to delivery.<br />
<br />
<strong>HANSA</strong> YACHTS <strong>01</strong> | <strong>2024</strong><br />
19