create a public hazard due to possible failure of the rockpile<br />
<strong>and</strong> its proximity to populated areas. Molycorp immediately<br />
began the mitigation work in an effort to create a more stable<br />
rockpile configuration <strong>and</strong> to alleviate any potential future<br />
public hazards. Over two years, the company studied the<br />
geotechnical stability of the pile, conducted an extensive<br />
public involvement process <strong>and</strong> regraded more than a million<br />
cubic yards of unstable material.<br />
MMD has also been involved in promoting alternate uses of<br />
reclaimed l<strong>and</strong>s. In 2008, MMD released the CR <strong>Minerals</strong><br />
Mill from the <strong>New</strong> <strong>Mexico</strong> Mining Act <strong>and</strong> released the final<br />
financial assurance back to CR <strong>Minerals</strong> Company, LLC.<br />
The approved post mining l<strong>and</strong>-use for the six-acre site is<br />
commercial/residential. Reclamation included removal of<br />
the mill equipment, buildings, <strong>and</strong> stockpiles; regrading the<br />
property; <strong>and</strong> installing storm water controls. The mill was<br />
built in the 1950s <strong>and</strong>, at that time, was beyond the Santa Fe<br />
city limits. At the time of release, the mill site was within the<br />
Santa Fe city limits <strong>and</strong> was immediately converted to the<br />
Zia Rail Runner Station.<br />
Lastly, in February of 2010, Chevron Mining Inc., initiated<br />
a project to build a 1-megawatt concentrating photovoltaic<br />
solar facility on the tailing site of the Questa molybdenum<br />
mine. The demonstration project will be the largest<br />
concentrating solar photovoltaic installation in the U.S. The<br />
facility will include approximately 175 solar panels on about<br />
twenty acres of l<strong>and</strong>. Construction began in summer 2010,<br />
<strong>and</strong> the plant should be completed by the summer of 2011.<br />
The electricity generated by the solar installation will be<br />
sold to the Kit Carson Electric Cooperative under a power<br />
purchase agreement. It will be enough electricity to power the<br />
village of Questa during the day when the sun is shining.<br />
ANNUAL REPORT 2010<br />
Prior to reclamation<br />
this was the site of<br />
the CR <strong>Minerals</strong> Mill.<br />
Photo by: David Ohori<br />
Photo by: David Ohori<br />
Zia Rail Runner<br />
station being<br />
constructed on<br />
reclaimed CR<br />
<strong>Minerals</strong> Mill<br />
property in Santa Fe.<br />
77