create a public hazard due to possible failure of the rockpile<br />

<strong>and</strong> its proximity to populated areas. Molycorp immediately<br />

began the mitigation work in an effort to create a more stable<br />

rockpile configuration <strong>and</strong> to alleviate any potential future<br />

public hazards. Over two years, the company studied the<br />

geotechnical stability of the pile, conducted an extensive<br />

public involvement process <strong>and</strong> regraded more than a million<br />

cubic yards of unstable material.<br />

MMD has also been involved in promoting alternate uses of<br />

reclaimed l<strong>and</strong>s. In 2008, MMD released the CR <strong>Minerals</strong><br />

Mill from the <strong>New</strong> <strong>Mexico</strong> Mining Act <strong>and</strong> released the final<br />

financial assurance back to CR <strong>Minerals</strong> Company, LLC.<br />

The approved post mining l<strong>and</strong>-use for the six-acre site is<br />

commercial/residential. Reclamation included removal of<br />

the mill equipment, buildings, <strong>and</strong> stockpiles; regrading the<br />

property; <strong>and</strong> installing storm water controls. The mill was<br />

built in the 1950s <strong>and</strong>, at that time, was beyond the Santa Fe<br />

city limits. At the time of release, the mill site was within the<br />

Santa Fe city limits <strong>and</strong> was immediately converted to the<br />

Zia Rail Runner Station.<br />

Lastly, in February of 2010, Chevron Mining Inc., initiated<br />

a project to build a 1-megawatt concentrating photovoltaic<br />

solar facility on the tailing site of the Questa molybdenum<br />

mine. The demonstration project will be the largest<br />

concentrating solar photovoltaic installation in the U.S. The<br />

facility will include approximately 175 solar panels on about<br />

twenty acres of l<strong>and</strong>. Construction began in summer 2010,<br />

<strong>and</strong> the plant should be completed by the summer of 2011.<br />

The electricity generated by the solar installation will be<br />

sold to the Kit Carson Electric Cooperative under a power<br />

purchase agreement. It will be enough electricity to power the<br />

village of Questa during the day when the sun is shining.<br />

ANNUAL REPORT 2010<br />

Prior to reclamation<br />

this was the site of<br />

the CR <strong>Minerals</strong> Mill.<br />

Photo by: David Ohori<br />

Photo by: David Ohori<br />

Zia Rail Runner<br />

station being<br />

constructed on<br />

reclaimed CR<br />

<strong>Minerals</strong> Mill<br />

property in Santa Fe.<br />