20.01.2013 Views

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S<strong>of</strong>tware <strong>for</strong>/he<br />

switching system<br />

(APT)<br />

St<strong>and</strong>ard products<br />

36 %<br />

S<strong>of</strong>tware <strong>for</strong> the<br />

switching system<br />

New production<br />

4 %<br />

Fig. 4<br />

Distribution <strong>of</strong> the s<strong>of</strong>tware volume between<br />

st<strong>and</strong>ard <strong>and</strong> new production<br />

Fig. 5<br />

then added, fig. 3. Thanks to the block<br />

structure <strong>of</strong> the s<strong>of</strong>tware it has thus<br />

been possible to create st<strong>and</strong>ard allocations,<br />

despite functional differences between<br />

different exchanges, a fact which<br />

has been a considerable help in reducing<br />

an administration's costs.<br />

The far-reaching st<strong>and</strong>ardization has<br />

meant that nowadays when <strong>LM</strong> Ericsson<br />

deliver an exchange in a new market<br />

it is only necessary to design on average<br />

4% <strong>of</strong> the total amount <strong>of</strong> s<strong>of</strong>tware<br />

to be included in the exchange.<br />

The remainder can be collected as verified<br />

st<strong>and</strong>ard products from a library,<br />

fig. 4, without any changes being<br />

necessary.<br />

AKE 13 in the international<br />

network<br />

When AKE 13 was designed, one <strong>of</strong> the<br />

prerequisites was that the system<br />

should be suitable <strong>for</strong> the h<strong>and</strong>ling <strong>of</strong><br />

international <strong>and</strong> intercontinental traffic<br />

with particularly complex dem<strong>and</strong>s.<br />

The large traffic h<strong>and</strong>ling capacity,<br />

adaptability to different signalling sys­<br />

129<br />

tems <strong>and</strong> traffic routing requirements<br />

<strong>and</strong> the comprehensive maintenance<br />

functions are examples <strong>of</strong> characteristics<br />

that are important <strong>for</strong> the international<br />

traffic <strong>and</strong> which it has been possible<br />

to realize through the SPC technique.<br />

Of the 36 AKE 13 exchanges which<br />

have hitherto been put into operation or<br />

ordered, no less than 14 are international<br />

exchanges (table 1).<br />

System AKE 13 is able to provide all traffic<br />

facilities that have been agreed internationally,<br />

<strong>and</strong> the system is suitable<br />

<strong>for</strong> all levels in the international<br />

hierarchy. Today practically all the international<br />

signalling systems are in<br />

operation in AKE 13 exchanges, namely<br />

R1, R2, CCITT 4, CCITT 5 <strong>and</strong> CCITT 6.<br />

Facilities <strong>for</strong> connecting echo suppressors,<br />

individual ones or from a common<br />

group, <strong>and</strong> <strong>for</strong> automatically connecting<br />

in <strong>and</strong> disconnecting attenuators<br />

are built into the system. All current<br />

<strong>for</strong>ms <strong>of</strong> international accounting are<br />

catered <strong>for</strong>. Charging can be carried out<br />

by means <strong>of</strong> repeated metering pulses<br />

or toll ticketing. For example, pulse<br />

charging can be used <strong>for</strong> the national<br />

traffic <strong>and</strong> toll ticketing <strong>for</strong> the international<br />

traffic.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!