Table 3<br />

Number <strong>of</strong> component faults per rack <strong>and</strong> operating<br />

year in the Rotterdam DC<br />

Fig. 8<br />

Connection <strong>of</strong> the ITMC test desk to the switching<br />

network<br />

Type <strong>of</strong> equipment<br />

Central data processing equipment<br />

Test <strong>and</strong> control equipment<br />

I/O equipment<br />

Code switches<br />

Other switching devices<br />

No. <strong>of</strong><br />

racks<br />

30<br />

17<br />

2<br />

64<br />

90<br />

change is small compared with one in a<br />

conventional exchange because the<br />

logic functions are carried out by the<br />

s<strong>of</strong>tware.)<br />

Route supervision panel with lamps <strong>for</strong><br />

indicating route congestion <strong>and</strong> various<br />

types <strong>of</strong> blocking.<br />

A typewriter that provides access to all<br />

supervisory functions in the system.<br />

The design <strong>of</strong> ITMC can vary depending<br />

on the size <strong>of</strong> the exchange <strong>and</strong> the<br />

number <strong>of</strong> international lines. The<br />

equipment is normally placed in a separate<br />

room. It is then <strong>of</strong>ten most convenient<br />

to put the U-link racks in the same<br />

room. For small international exchanges,<br />

the ITMC equipment can be<br />

placed in the maintenance desk in the<br />

control room.<br />

Operational experience<br />

The SPC technique has made it possible<br />

to rationalize the operation <strong>and</strong> maintenance<br />

work to a very great extent. The<br />

administrations have pointed out many<br />

advantages, <strong>for</strong> example:<br />

- that changes <strong>of</strong> traffic routing data,<br />

route in<strong>for</strong>mation <strong>and</strong> also charging<br />

<strong>and</strong> accounting data require considerably<br />

less resources <strong>and</strong> can be carried<br />

out in very much shorter time in<br />

AKE 13 than in conventional systems.<br />

A comparison is made on the last<br />

page <strong>of</strong> this article<br />

— that it is easier to introduce functional<br />

changes since the majority <strong>of</strong> the<br />

1972<br />

No. <strong>of</strong> faults<br />

per rack<br />

04<br />

1 82<br />

2.0<br />

0.047<br />

0.28<br />

No. <strong>of</strong><br />

racks<br />

47<br />

32<br />

4<br />

128<br />

158<br />

1975<br />

No. <strong>of</strong> faults<br />

per rack<br />

0.28<br />

1.53<br />

0.25<br />

0056<br />

0082<br />

functions are realized in s<strong>of</strong>tware<br />

— that the efficient supervision <strong>and</strong><br />

fault localization functions have<br />

meant that in AKE 13, more <strong>of</strong>ten than<br />

in previous systems, faults are detected<br />

<strong>and</strong> cleared be<strong>for</strong>e the subscribers<br />

complain<br />

— that the connection <strong>and</strong> testing <strong>of</strong><br />

lines is greatly facilitated by the<br />

maintenance panel <strong>and</strong> typewriter<br />

provided.<br />

Extension <strong>of</strong> exchanges in operation<br />

It has already been mentioned that several<br />

AKE 13 exchanges in operation<br />

have been extended, table 2. The great<br />

flexibility <strong>of</strong> the system <strong>of</strong>fers an almost<br />

unlimited variety <strong>of</strong> extension configurations,<br />

but experience from the extensions<br />

that have been carried out<br />

shows that it is possible to limit <strong>and</strong><br />

st<strong>and</strong>ardize the number <strong>of</strong> extension<br />

configurations <strong>and</strong> still meet all requirements<br />

that the administrations<br />

may have. This st<strong>and</strong>ardization has the<br />

following advantages:<br />

— it admits the development <strong>of</strong> st<strong>and</strong>ardized<br />

methods <strong>and</strong> aids<br />

— it gives short installation <strong>and</strong> testing<br />

times<br />

— extensions can be carried out without<br />

specialist aid<br />

— it reduces the amount <strong>of</strong> resources<br />

required in all h<strong>and</strong>ling stages<br />

— it gives high reliability<br />

Component reliability<br />

In a previous article on the first AKE 13<br />

exchange, Rotterdam DC 1 , the number