20.01.2013 Views

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

Selection and Testing of Electronic Components for LM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

" The maximum number <strong>of</strong> lines that can be connected<br />

to a certain switchboard is dependent on a<br />

number <strong>of</strong> factors, such as the amount <strong>of</strong> traffic,<br />

type <strong>of</strong> traffic, the efficiency <strong>of</strong> the operator, calling<br />

habits, local tradition etc. Under normal circumstances<br />

an operator in a single-position magneto<br />

switchboard can h<strong>and</strong>le a maximum <strong>of</strong> 100-140<br />

magneto lines <strong>and</strong> 8 CB lines. However, if the<br />

amount <strong>of</strong> traffic is very small it is possible in some<br />

cases to h<strong>and</strong>le more than 200 lines<br />

Technical data<br />

Maximum number* <strong>of</strong><br />

magneto lines<br />

CB junction lines<br />

Cord pairs<br />

Dimensions in cm<br />

Width<br />

Height<br />

Depth<br />

Approx. weight, kg<br />

Operating voltage<br />

6VD.C.<br />

Base unit<br />

+ 1 line box<br />

80 70 60<br />

- 4 8<br />

18 18 18<br />

62<br />

41<br />

53<br />

40<br />

Line resistance<br />

The maximum value <strong>of</strong> the line resistance<br />

<strong>for</strong> magneto lines is dependent on<br />

the line attenuation, which may amount<br />

to 15 dB. The leakage resistance must<br />

not be less than 10000 ohms. The indicators<br />

drop at 9 mA. The resistance <strong>and</strong><br />

leakage values <strong>for</strong> CB junction lines are<br />

primarily dependent on the limit values<br />

<strong>of</strong> the main exchange. Thus the maximum<br />

values <strong>for</strong> these lines must be<br />

calculated on the basis <strong>of</strong> data from the<br />

main exchange.<br />

Base unit<br />

+ 2 line boxes<br />

160 150 140<br />

- 4 8<br />

18 18 18<br />

ABJ 101<br />

62<br />

59<br />

53<br />

55<br />

Base unit<br />

+ 3 line boxes<br />

240 230 220<br />

4 8<br />

18 18 18<br />

62<br />

77<br />

53<br />

70<br />

Advantages<br />

The exchange has been given all the<br />

characteristics that can be dem<strong>and</strong>ed<br />

from a modern manual magneto<br />

switchboard which means that<br />

— CB junction lines from manual or automatic<br />

exchanges can be connected<br />

— magneto junction lines can be connected<br />

to the ordinary magneto units<br />

— supervision <strong>of</strong> a junction line can be<br />

carried out by the operator while<br />

h<strong>and</strong>ling other calls<br />

— line splitting gives the operator the<br />

possibility <strong>of</strong> talking to one party<br />

without the other being able to overhear<br />

the conversation<br />

— the ringing is generated automatically<br />

(transistorized)<br />

— a flag indicator indicates that a signal<br />

is being sent out<br />

— a ring-back tone is sent to the caller<br />

— backward ringing can be carried out<br />

via the answering cord<br />

— acoustic signals can be obtained<br />

concurrently with incoming seizure<br />

<strong>and</strong> clear-<strong>for</strong>ward signals<br />

— a fixed acoustic signal can be connected<br />

in by means <strong>of</strong> a switch<br />

— dropped indicators are automatically<br />

reset during the h<strong>and</strong>ling <strong>of</strong> the calls<br />

— a battery indicator indicates when it<br />

is time to check the condition <strong>of</strong> the<br />

battery<br />

— testing <strong>of</strong> the cords can be per<strong>for</strong>med<br />

— an automatic fuse eliminates fuse<br />

changes<br />

— anextrajack is provided <strong>for</strong> connecting<br />

in a h<strong>and</strong>set <strong>for</strong> an assistance<br />

operator<br />

— space is provided <strong>for</strong>the memor<strong>and</strong>a<br />

that the operator needs to have readily<br />

accessible in order to be able to<br />

work rapidly <strong>and</strong> efficiently.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!