Amount of<br />

the contract<br />

Payment of<br />

the price<br />

Engineer -<br />

Clarification<br />

of contract<br />

Design<br />

changes<br />

Change of co<br />

nstruction<br />

period<br />

Change<br />

of contract pr<br />

ice<br />

Claim -<br />

Resolution of<br />

Disputes<br />

Other<br />

Table 15: Comparison between GCW <strong>and</strong> FIDIC<br />

GCW (Japanese contract st<strong>and</strong>ard) Fidic 1999 conditions of contract <strong>for</strong> construction<br />

• Total value contracts<br />

• Submit a breakdown 26<br />

Pre-payment, (fee-<strong>for</strong>-service) partial<br />

payment<br />

Specify the agenda among the orderor <strong>and</strong><br />

contractor in the particular specification<br />

• Orderer can change the design books<br />

• Orderer must change the fee amount or<br />

construction period, if needed.<br />

Consultation between orderer <strong>and</strong> contractor<br />

If the consultation was not be settled, orderer<br />

can set the change <strong>and</strong> notify it to the<br />

contractor<br />

Consultation between orderer <strong>and</strong> contractor<br />

in some cases, or the price can be set based<br />

on the unit price in the detailed statement<br />

If the consultation was not be settled, orderer<br />

can set the change <strong>and</strong> notify it to the<br />

contractor<br />

• Arbitration or mediation by the<br />

Construction dispute mediation by<br />

Construction Work<br />

• Dispute Examination<br />

• No term definition<br />

• Frequent use of the term “good faith”<br />

87<br />

• Contract based on quantity surveying<br />

• Submit a detailed bill of quantities showing unit prices<br />

<strong>for</strong> each item at the time of bidding<br />

Monthly fee-<strong>for</strong>-service payment<br />

• Orderer appoint the engineer carrying out the<br />

delegated obligations under the contract<br />

• If engineer needs to obtain the approval of orderer<br />

be<strong>for</strong>e exercising the authority, its requirements should<br />

be described in the special conditions<br />

• Engineer can give the contractor the necessary<br />

instructions, <strong>and</strong> issue additional or modified drawings.<br />

Clarify the responsibilities in the contract book<br />

• Engineer is able to invoke the change by the request of<br />

the proposal submission or instructions against orderer<br />

• Contractor is entitled to extend the time limit <strong>for</strong><br />

completion by the claims under certain conditions<br />

-<br />

• Orders notifies the engineer about the extension of<br />

completion time <strong>and</strong> additional payments<br />

• Engineer answers approval or disapproval of the claim<br />

• Arbitration by Dispute Adjudication Board (DAB)<br />

• International arbitration<br />

Source: Government of Japan, Ministry of L<strong>and</strong>, Infrastructure, Transport <strong>and</strong> Tourism (2010). Attempt of<br />

orders <strong>and</strong> contracts with reference to the FIDIC<br />

It is said that this Japanese system has some advantages from the viewpoint of the social cost. In a<br />

country with an adversarial contractual relationship, where the incentive of moral hazard works<br />

26 Since April 2010, a new method was applied in the general civil engineering work under the direct control of the<br />

government, which requires the agreement of unit price after total price contract.<br />

• -