Engineer -<br />
Clarification<br />
of contract<br />
Design<br />
changes<br />
Change of co<br />
nstruction<br />
period<br />
Change<br />
of contract pr<br />
ice<br />
Claim -<br />
Resolution of<br />
Disputes<br />
Other<br />
Table 15: Comparison between GCW <strong>and</strong> FIDIC<br />
GCW (Japanese contract st<strong>and</strong>ard) Fidic 1999 conditions of contract <strong>for</strong> construction<br />
• Total value contracts<br />
• Submit a breakdown 26<br />
Pre-payment, (fee-<strong>for</strong>-service) partial<br />
payment<br />
Specify the agenda among the orderor <strong>and</strong><br />
contractor in the particular specification<br />
• Orderer can change the design books<br />
• Orderer must change the fee amount or<br />
construction period, if needed.<br />
Consultation between orderer <strong>and</strong> contractor<br />
If the consultation was not be settled, orderer<br />
can set the change <strong>and</strong> notify it to the<br />
contractor<br />
Consultation between orderer <strong>and</strong> contractor<br />
in some cases, or the price can be set based<br />
on the unit price in the detailed statement<br />
If the consultation was not be settled, orderer<br />
can set the change <strong>and</strong> notify it to the<br />
contractor<br />
• Arbitration or mediation by the<br />
Construction dispute mediation by<br />
Construction Work<br />
• Dispute Examination<br />
• No term definition<br />
• Frequent use of the term “good faith”<br />
87<br />
• Contract based on quantity surveying<br />
• Submit a detailed bill of quantities showing unit prices<br />
<strong>for</strong> each item at the time of bidding<br />
Monthly fee-<strong>for</strong>-service payment<br />
• Orderer appoint the engineer carrying out the<br />
delegated obligations under the contract<br />
• If engineer needs to obtain the approval of orderer<br />
be<strong>for</strong>e exercising the authority, its requirements should<br />
be described in the special conditions<br />
• Engineer can give the contractor the necessary<br />
instructions, <strong>and</strong> issue additional or modified drawings.<br />
Clarify the responsibilities in the contract book<br />
• Engineer is able to invoke the change by the request of<br />
the proposal submission or instructions against orderer<br />
• Contractor is entitled to extend the time limit <strong>for</strong><br />
completion by the claims under certain conditions<br />
-<br />
• Orders notifies the engineer about the extension of<br />
completion time <strong>and</strong> additional payments<br />
• Engineer answers approval or disapproval of the claim<br />
• Arbitration by Dispute Adjudication Board (DAB)<br />
• International arbitration<br />
Source: Government of Japan, Ministry of L<strong>and</strong>, Infrastructure, Transport <strong>and</strong> Tourism (2010). Attempt of<br />
orders <strong>and</strong> contracts with reference to the FIDIC<br />
It is said that this Japanese system has some advantages from the viewpoint of the social cost. In a<br />
country with an adversarial contractual relationship, where the incentive of moral hazard works<br />
26 Since April 2010, a new method was applied in the general civil engineering work under the direct control of the<br />
government, which requires the agreement of unit price after total price contract.<br />
• -