2009 Annual Report - CRH
2009 Annual Report - CRH
2009 Annual Report - CRH
- TAGS
- annual
- www.crh.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The International Building<br />
Materials Group<br />
<strong>CRH</strong> plc<br />
Belgard Castle<br />
Clondalkin<br />
Dublin 22<br />
Ireland<br />
Telephone: +353 1 404 1000<br />
Fax: +353 1 404 1007<br />
E-mail: mail@crh.com<br />
Website: www.crh.com<br />
Registered Office<br />
42 Fitzwilliam Square<br />
Dublin 2<br />
Ireland<br />
Telephone: +353 1 634 4340<br />
Fax: +353 1 676 5013<br />
E-mail: crh42@crh.com<br />
Gotthard Base Tunnel is part of the Swiss<br />
Alp Transit project, also known as the New<br />
Railway Link through the Alps. With a planned<br />
length of 57 km it will, on completion, be<br />
the longest railway/road tunnel in the world.<br />
Planning for the project started in 1993<br />
with mechanical excavation commencing<br />
in 2003. The project features two separate<br />
tunnels containing one track each. Final<br />
break-through is expected in Winter 2010<br />
with an opening date planned for 2017. Jura<br />
Cement, a <strong>CRH</strong> company, under contract<br />
to ARGE AGN, has to date (2003-<strong>2009</strong>)<br />
delivered circa 215,000 tonnes of cement to<br />
this project.