30.01.2013 Views

2009 Annual Report - CRH

2009 Annual Report - CRH

2009 Annual Report - CRH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The International Building<br />

Materials Group<br />

<strong>CRH</strong> plc<br />

Belgard Castle<br />

Clondalkin<br />

Dublin 22<br />

Ireland<br />

Telephone: +353 1 404 1000<br />

Fax: +353 1 404 1007<br />

E-mail: mail@crh.com<br />

Website: www.crh.com<br />

Registered Office<br />

42 Fitzwilliam Square<br />

Dublin 2<br />

Ireland<br />

Telephone: +353 1 634 4340<br />

Fax: +353 1 676 5013<br />

E-mail: crh42@crh.com<br />

Gotthard Base Tunnel is part of the Swiss<br />

Alp Transit project, also known as the New<br />

Railway Link through the Alps. With a planned<br />

length of 57 km it will, on completion, be<br />

the longest railway/road tunnel in the world.<br />

Planning for the project started in 1993<br />

with mechanical excavation commencing<br />

in 2003. The project features two separate<br />

tunnels containing one track each. Final<br />

break-through is expected in Winter 2010<br />

with an opening date planned for 2017. Jura<br />

Cement, a <strong>CRH</strong> company, under contract<br />

to ARGE AGN, has to date (2003-<strong>2009</strong>)<br />

delivered circa 215,000 tonnes of cement to<br />

this project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!