04.02.2013 Views

An innovative greywater treatment system for urban areas ... - SuSanA

An innovative greywater treatment system for urban areas ... - SuSanA

An innovative greywater treatment system for urban areas ... - SuSanA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 13: International <strong>greywater</strong> <strong>treatment</strong> projects based membrane bioreactor technology (MBR), sorted in alphabetic country order; (enquiry by K. Löw)<br />

Company<br />

Time<br />

expense<br />

<strong>for</strong> maintenane<br />

Reuse Inspection<br />

and maintanance<br />

interval<br />

Greyw ater<br />

production<br />

Operation<br />

time<br />

Time period or<br />

project start<br />

Size Treatment<br />

capacity<br />

Type of<br />

building<br />

Country Tow n Name of the<br />

project<br />

process w ater n. a. n. a. HUBER SE<br />

<strong>for</strong> automatic<br />

cleaning of<br />

greyw ater and<br />

brow nw ater<br />

preceding screen<br />

toilet flushing 1x per year n. a. geoterra<br />

Office building 200 employees 600 l/d May 11 0,5 years w ashbasins,<br />

kitchen sinks,<br />

dishw asher<br />

Germany Eschborn SANIRESCH<br />

(reference<br />

project) GIZ<br />

w ashbasins,<br />

show er trays<br />

2000 l/d 1 April 2008 report after<br />

16 month<br />

Germany Espenhain - Recycling<br />

company<br />

180 appartments 4100 l/d 1 July 1905 n. a. w ashbasins, toilet flushing n. a. n. a. Dehoust<br />

show er trays<br />

GmbH<br />

20-30 persons 2800 l/d May 2006 5 years greyw ater toilet flushing, n. a. n. a. Dehoust<br />

w ashing<br />

GmbH<br />

mashines and<br />

irrigation<br />

70 appartments 5000 l/d Oct 2007 report after bath and show er toilet flushing n. a. n. a. Dehoust<br />

2 years trays<br />

GmbH<br />

Germany Heidelberg „Comenius- Hall of<br />

haus“ residence<br />

Germany Mainz Lebenshilfe Multi-storey<br />

dw elling<br />

n. a. n. a. Dehoust<br />

GmbH<br />

Germany Mannheim "Eastside" Hall of<br />

residence<br />

Multi-storey<br />

dw elling<br />

60-70 persons 2800 l/d May 2006 5 years greyw ater toilet flushing,<br />

w ashing<br />

mashines and<br />

irrigation<br />

Germany Mechernich residential<br />

accommodation<br />

<strong>for</strong><br />

persons w ith<br />

disabilities<br />

96 persons 5000 l/d Oct 2010 1 year greyw ater toilet flushing n. a. n. a. Dehoust<br />

GmbH<br />

Hall of<br />

residence<br />

Germany Nephten „Im<br />

Münchfeld"<br />

Germany Nettetal - Hospital 187 beds 2200 l/d January 2009 2 years greyw ater toilet flushing n. a. n. a. Dehoust<br />

GmbH<br />

Germany Östringen "Wackerhof" Camping site 6300 l/d 1 June 2007 4,5 years w ashbasins, toilet flushing 1x per year ca. 6 h/a HUBER SE<br />

show er tray<br />

(change of<br />

outflow s of the<br />

membrane<br />

camping site and<br />

modules)<br />

kitchen sink<br />

outflow of the<br />

n. a. n. a. Dehoust<br />

GmbH<br />

dw elling<br />

20 persons 1000 l/d May 2006 5 years greyw ater toilet flushing,<br />

w ashing<br />

mashines and<br />

irrigation<br />

Germany Wenden Lebenshilfe Multi-storey<br />

dw elling<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!