An innovative greywater treatment system for urban areas ... - SuSanA
An innovative greywater treatment system for urban areas ... - SuSanA
An innovative greywater treatment system for urban areas ... - SuSanA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 13: International <strong>greywater</strong> <strong>treatment</strong> projects based membrane bioreactor technology (MBR), sorted in alphabetic country order; (enquiry by K. Löw)<br />
Company<br />
Time<br />
expense<br />
<strong>for</strong> maintenane<br />
Reuse Inspection<br />
and maintanance<br />
interval<br />
Greyw ater<br />
production<br />
Operation<br />
time<br />
Time period or<br />
project start<br />
Size Treatment<br />
capacity<br />
Type of<br />
building<br />
Country Tow n Name of the<br />
project<br />
process w ater n. a. n. a. HUBER SE<br />
<strong>for</strong> automatic<br />
cleaning of<br />
greyw ater and<br />
brow nw ater<br />
preceding screen<br />
toilet flushing 1x per year n. a. geoterra<br />
Office building 200 employees 600 l/d May 11 0,5 years w ashbasins,<br />
kitchen sinks,<br />
dishw asher<br />
Germany Eschborn SANIRESCH<br />
(reference<br />
project) GIZ<br />
w ashbasins,<br />
show er trays<br />
2000 l/d 1 April 2008 report after<br />
16 month<br />
Germany Espenhain - Recycling<br />
company<br />
180 appartments 4100 l/d 1 July 1905 n. a. w ashbasins, toilet flushing n. a. n. a. Dehoust<br />
show er trays<br />
GmbH<br />
20-30 persons 2800 l/d May 2006 5 years greyw ater toilet flushing, n. a. n. a. Dehoust<br />
w ashing<br />
GmbH<br />
mashines and<br />
irrigation<br />
70 appartments 5000 l/d Oct 2007 report after bath and show er toilet flushing n. a. n. a. Dehoust<br />
2 years trays<br />
GmbH<br />
Germany Heidelberg „Comenius- Hall of<br />
haus“ residence<br />
Germany Mainz Lebenshilfe Multi-storey<br />
dw elling<br />
n. a. n. a. Dehoust<br />
GmbH<br />
Germany Mannheim "Eastside" Hall of<br />
residence<br />
Multi-storey<br />
dw elling<br />
60-70 persons 2800 l/d May 2006 5 years greyw ater toilet flushing,<br />
w ashing<br />
mashines and<br />
irrigation<br />
Germany Mechernich residential<br />
accommodation<br />
<strong>for</strong><br />
persons w ith<br />
disabilities<br />
96 persons 5000 l/d Oct 2010 1 year greyw ater toilet flushing n. a. n. a. Dehoust<br />
GmbH<br />
Hall of<br />
residence<br />
Germany Nephten „Im<br />
Münchfeld"<br />
Germany Nettetal - Hospital 187 beds 2200 l/d January 2009 2 years greyw ater toilet flushing n. a. n. a. Dehoust<br />
GmbH<br />
Germany Östringen "Wackerhof" Camping site 6300 l/d 1 June 2007 4,5 years w ashbasins, toilet flushing 1x per year ca. 6 h/a HUBER SE<br />
show er tray<br />
(change of<br />
outflow s of the<br />
membrane<br />
camping site and<br />
modules)<br />
kitchen sink<br />
outflow of the<br />
n. a. n. a. Dehoust<br />
GmbH<br />
dw elling<br />
20 persons 1000 l/d May 2006 5 years greyw ater toilet flushing,<br />
w ashing<br />
mashines and<br />
irrigation<br />
Germany Wenden Lebenshilfe Multi-storey<br />
dw elling<br />
35