4.1 Loviisa NPP<br />

Spare parts management at<br />

the Loviisa power plant<br />

In 2011, <strong>STUK</strong> <strong>in</strong>spected the sufficiency <strong>of</strong> spare<br />

parts for systems and equipment important to<br />

<strong>safety</strong> and the functionality <strong>of</strong> spare parts management<br />

at the Loviisa power plant. The <strong>in</strong>spection focussed<br />

<strong>in</strong> particular on the spare parts <strong>in</strong>ventory <strong>of</strong><br />

systems and equipment important to <strong>safety</strong> as well<br />

as on the procedures used at the power plant for<br />

monitor<strong>in</strong>g the spare parts needs and for procur<strong>in</strong>g<br />

spare parts. The <strong>in</strong>spection found that the licensee<br />

is aware <strong>of</strong> the challenges related to the availability<br />

<strong>of</strong> spare parts and <strong>in</strong>itiated <strong>in</strong> 2011 an <strong>in</strong>vestigation<br />

regard<strong>in</strong>g spare parts requirements. <strong>STUK</strong><br />

deems the <strong>in</strong>vestigation and its completion important.<br />

Furthermore, <strong>STUK</strong> found that the overall<br />

responsibilities, procedures and <strong>in</strong>structions regard<strong>in</strong>g<br />

spare parts management must be further<br />

specified so that the spare parts requirements <strong>of</strong><br />

systems and equipment important to <strong>safety</strong> are<br />

foreseen and that the procurement procedures ensure<br />

the timely availability <strong>of</strong> spare parts. Matters<br />

requir<strong>in</strong>g immediate corrective actions were also<br />

observed <strong>in</strong> the storage conditions <strong>of</strong> spare parts<br />

for systems and equipment important to <strong>safety</strong>,<br />

such as further specification <strong>of</strong> procedures related<br />

to the age<strong>in</strong>g and ma<strong>in</strong>tenance <strong>of</strong> the stored spare<br />

parts as well as verification <strong>of</strong> the usefulness <strong>of</strong><br />

aged items <strong>in</strong> the store or their removal from the<br />

store. The licensee must submit to <strong>STUK</strong> an account<br />

<strong>of</strong> the immediate corrective actions by the<br />

beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong> March 2012 and draw up, dur<strong>in</strong>g the<br />

spr<strong>in</strong>g 2012, a development plan for spare parts<br />

management for the period 2012–2016. <strong>STUK</strong> considers<br />

a long-term development plan necessary <strong>in</strong><br />

order to ensure the availability <strong>of</strong> spare parts for<br />

the systems and equipment important to <strong>safety</strong><br />

throughout the entire planned service life <strong>of</strong> the<br />

plant unit.<br />

Spare part problems regard<strong>in</strong>g<br />

the pump motors <strong>of</strong> the highpressure<br />

<strong>safety</strong> <strong>in</strong>jection system<br />

The spare part problems regard<strong>in</strong>g the pump motors<br />

<strong>of</strong> the high-pressure <strong>safety</strong> <strong>in</strong>jection system<br />

surfaced <strong>in</strong> 2010 when a spare motor was <strong>in</strong>stalled<br />

<strong>in</strong> place <strong>of</strong> a faulty motor. The replacement motor<br />

<strong>in</strong>stalled <strong>in</strong> the component location was the last<br />

spare motor <strong>in</strong> store for the <strong>safety</strong> <strong>in</strong>jection system<br />

at the Loviisa power plant. Consequently, the pow-<br />

<strong>STUK</strong>-B 147<br />

er plant has <strong>in</strong>itiated the process for procur<strong>in</strong>g new<br />

motors. <strong>STUK</strong> has required the power company to<br />

submit a plan and time schedule for replac<strong>in</strong>g the<br />

motors because the faults occurr<strong>in</strong>g <strong>in</strong> the pump<br />

motors <strong>of</strong> the high-pressure <strong>safety</strong> <strong>in</strong>jection system<br />

<strong>in</strong>dicate that the orig<strong>in</strong>al Soviet-made motors<br />

should be replaced.<br />

Management <strong>of</strong> EDG spare parts<br />

In conjunction with its <strong>in</strong>spections and regulatory<br />

activities, <strong>STUK</strong> has paid attention to the<br />

poor spare parts situation <strong>of</strong> the emergency diesel<br />

generators at the Loviisa power plant and to the<br />

procurement and availability <strong>of</strong> critical parts. The<br />

goal must be to secure the long-term availability<br />

<strong>of</strong> good quality spare parts for the EDGs. In order<br />

to improve the situation, Fortum has concluded<br />

a framework agreement with the motor supplier<br />

for the spare parts required for basic ma<strong>in</strong>tenance<br />

and for other separately specified critical mechanical<br />

spares. The power company has also ordered<br />

more spare parts with long delivery times to be<br />

kept <strong>in</strong> store for the annual ma<strong>in</strong>tenance outages.<br />

Furthermore, Fortum <strong>in</strong>tends to audit the spare<br />

parts suppliers among the motor supplier’s subcontractors<br />

with whom quality problems have been<br />

encountered. <strong>STUK</strong> will assess the sufficiency <strong>of</strong><br />

these actions <strong>in</strong> early 2012.<br />

4.1.5 Development <strong>of</strong> the plant and its <strong>safety</strong><br />

In 2007, <strong>STUK</strong> issued its statement to the M<strong>in</strong>istry<br />

<strong>of</strong> Trade and Industry (currently the M<strong>in</strong>istry <strong>of</strong><br />

Economy and the Employment) regard<strong>in</strong>g the renewal<br />

<strong>of</strong> Loviisa NPP’s operat<strong>in</strong>g licence and the<br />

plant’s periodic <strong>safety</strong> review. Fortum Power and<br />

Heat Oy presented, <strong>in</strong> connection with the periodic<br />

<strong>safety</strong> assessment, an action plan for develop<strong>in</strong>g<br />

the plant’s <strong>safety</strong>. It <strong>in</strong>cludes decreas<strong>in</strong>g the risk <strong>of</strong><br />

accidents and releases through various actions and<br />

supplement<strong>in</strong>g the Probabilistic Risk Assessment.<br />

The actions have, <strong>in</strong> the ma<strong>in</strong>, progressed <strong>in</strong> l<strong>in</strong>e<br />

with the action plan. However, the <strong>in</strong>tention is<br />

to implement certa<strong>in</strong> actions aimed at improv<strong>in</strong>g<br />

<strong>safety</strong> <strong>in</strong> connection with the I&C upgrade <strong>of</strong> the<br />

Loviisa power plant. The <strong>in</strong>tention is to reduce the<br />

risk associated with lift<strong>in</strong>g heavy loads by modifications<br />

implemented <strong>in</strong> connection with modernis<strong>in</strong>g<br />

the fuel transfer mach<strong>in</strong>e. They will allow us<strong>in</strong>g<br />

lift<strong>in</strong>g routes more beneficial to plant <strong>safety</strong>.<br />

S<strong>in</strong>ce the above projects have been delayed from<br />

35